Purpose

Schedule jobs for IUUC delta replay

In this activity, you schedule a certain number of batch jobs to transfer the data that have been created, changed or deleted during the time period of the monitored production from the hitherto production system to the future production system. Depending on the available system resources, some 15 to 20 batch jobs could be scheduled.

The access plan ID to be entered here must correspond to the one entered in the previous activity ""Start Access Plan Calculation"

Integration

Prerequisites

Features

Selection

Standard Variants

Output

Activities

Example