Ansicht
Dokumentation
J_1SZEB0 - IS-M/SD CH/V: Create Seq.File from PTT Number Plan for ZEBU Setup
CL_GUI_FRONTEND_SERVICES - Frontend Services General Material DataThis documentation is copyright by SAP AG.
Purpose
Programs J_1SZEB0 and J_1SZEB1 are used to load the PTT number plan for bundling and sacking into the SAP tables J_1SORGZEB and J_1SZUOZEB.
Program J_1SZEB0 converts the PTT number plan for bundling and sacking to an SAP format and generates a temporary file ISP_PTT_ZEBUDAT, which is used by the loading program J_1SZEB1.
The PTT supplies an Excel file. This file must be converted to text format (see Data Format). The second step is to convert the text file to the structure described below.
Data element,,Length,, ,,Description
_______________________________________________
Fr. PCd,,,,,,4,,,,Postal code from (4-digit)
Dash ,,,,,,1,,,,Dash ´ - ´
To PCd.,,,,,,4,,,,Postal code to (4-digit)
Blank,,,,,,1,,,,Space
Level 2,,,,,,25,,,,PCode for 'Ortsammelbunde' (4-digit)
Level 3,,,,,,25,,,,PCode for 'Durchgangsbunde' (4-digit)
Level 4 ,,,,25,,,,PCode for 'Leitgebietsbunde' (4-digit)
Level 5,,,,,,25,,,,PCode for 'BZ Bunde' (4-digit)
Sack,,,,,,25,,,,Text Sack address
Prerequisites
1. The logical path must be maintained. Logical path: ISP_PTT_ZEBUDAT
2. The logical file name must be maintained: ISP_PTT_ZEBUDAT
Please adhere to the order in which the report should be processed.
- J_1SZEB0 (Create sequential file from PTT number plan for ZEBU struc.)
- J_1SZEB1 (Set up ZEBU file from PTT number plan)
Program J_1SZEB0 can be restarted if the prerequisites are fulfilled.
Output
The following physical temporary file is generated:
ISP_PTT_ZEBUDAT (SAP ZEBU temporary file)
Activities
Do not change the physical SAP file name ISP_PTT_ZEBUDAT.
General Data in Customer Master TXBHW - Original Tax Base Amount in Local Currency
This documentation is copyright by SAP AG.
Length: 2038 Date: 20240531 Time: 114907 sap01-206 ( 23 ms )