In Application Link Enabling, you use this program to distribute material master data to other systems by sending it direct. The sending system can be configured in one of the following ways:

  • Industry system
Only materials maintained in the industry material master can be sent.
  • Retail system
Only materials maintained in the retail material master can be sent.
Note
It is not yet possible to select materials via the Listing fields.
  • Mixed system
Both industry and retail materials can be sent.

By specifying a logical system in the corresponding field, you can restrict the list of IDoc recipients to the recipient entered.

By selecting the Send material in full indicator, you can also distribute the following dependent data for the material (depending on the type of system) in addition to the actual material master data:

  • Industry system
  • Classification data for the material

  • Links to documents in the document management system

  • Singe material variants

To do this, you have to set the Send Material in Full indicator in Customizing for the material master. Do this by selecting Basic Settings -> Make Global Settings.
  • Revision levels assigned to the material

  • Retail system
  • Listing conditions

  • Purchasing info records

  • Source list records

  • Purchasing conditions

  • Sales conditions

  • BOM allocations

  • Mixed system
  • The indicator applies to both message types (standard and retail). As a result, either the dependent data for industry materials or the dependent data for retail materials is distributed, depending on the material concerned, if this indicator is set.

Note
If inbound processing for the dependent data is set such that the arriving IDocs are posted directly in the target system, errors can occur if the IDoc with the material master data has not yet been posted. In this case, the IDocs containing the dependent data must be reposted, for example, in a specially scheduled job that periodically reposts all IDocs not processed correctly.
To prevent this problem, you can schedule one periodic job for posting the material master data, and another for each dependent object. By executing the job for the material master data long enough in advance of the jobs for the dependent data, you can ensure that the IDocs containing the dependent data are processed only after the material master data has been posted.

If you specify a server group in the corresponding field, the processing of the materials selected is distributed among the application servers contained in the server group. In the Number of Materials Per Process field, you can define the number of materials to be processed before a new process is started on one of the application servers.

Requirements

  • Industry system
You have entered a message type in the Message type (standard) field.
  • Retail system
You have entered a message type in the Message type (Retail) field.
  • Mixed system
You have entered a message type in the Message type (standard) field and in the Message type (Retail) field.

Output

Example






ROGBILLS - Synchronize billing plans   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.

Length: 4888 Date: 20240520 Time: 104211     sap01-206 ( 71 ms )