Ansicht
Dokumentation
REHS_MP_CONTROL - List Monitoring Dates
BAL Application Log Documentation PERFORM Short ReferenceThis documentation is copyright by SAP AG.
Purpose
With this report program you can track dates for control measurements in measurement projects. You can determine overdue dates or dates that lie in the future.
Features
Selection
The program evaluates the
To determine the due dates, specify the number of months for which the program is to evaluate dates in the future.
To determine the overdue dates, specify the period for which the program is to evaluate dates in the past.
Output
The results list contains the following information:
- Due or overdue date
- Site
- Building
- Work area
- Measurement project type
For selected entries, you can navigate to the Measurement Management hit list using the display details function.
Prerequisites
This report can only determine missed deadlines if the following prerequisites are fulfilled:
- The measurement project must be released.
- In the assigned work area for the measurement project, a date for the next check must be entered on the 'Close' tab page.
- The work areas used for 'Operation' and 'Work Area' in the measurement project must be assigned to the relevant level in Customizing for measurement projects.
Features
You can use environment parameter
-
Note
If you enter a space, all measurement project types are filtered out.
Selection
Standard Variants
Output
Activities
Example
TXBHW - Original Tax Base Amount in Local Currency SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up
This documentation is copyright by SAP AG.
Length: 2280 Date: 20240520 Time: 105833 sap01-206 ( 33 ms )