Ansicht
Dokumentation
RJBRXP02 - Report for Converting Old Due Date Scenarios
rdisp/max_wprun_time - Maximum work process run time SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3upThis documentation is copyright by SAP AG.
Description
The due date scenario functionality has been extended so that you can now define due dates for absolute points in time as well. This and other enhancements to the functionality and in the definition of due date scenarios necessitates this report, which has the job of converting existing due date scenarios.
Procedure: The due date scenario definition is retained. The fictitious flows are stored as a period
block with the name
You need to maintain the long and short descriptions for the period blocks manually within customizing. These texts are purely for documentation purposes, however.
Requirements
If the report terminates during the upgrade, you can restart it manually at any time (RJBRFSZ).
Output
Example
DDS items: MANDT ABLAUFFIKT FIKTCFNR STEPS ZEITEINH ABLAUFREL |
---|
(Client)(Fict.outf)(Fict.cf.no)(Steps)(Time unit)(Rel.outfl) |
300 FUS 100 01 02 10.00 |
300 FUS 200 01 02 20.00 |
300 FUS 300 01 03 20.00 |
This becomes:
Header info: MANDT ABLAUFFIKT SZNBEGINN SZNENDE SOCKEL ABSKENNZ |
---|
(Client)(Fict.outf)(Scen.start)(Scen.end)(Base) (Absol.ind) |
300 FUS 00000000 00000000 0.0 |
Relative setting: MANDT ABLAUFFIKT FIKTCFNR PERIODENBLOCK ANZAHL |
---|
(Client)(Fict.outf)(Fict.cf.no) (Per.block) (Quantity) |
300 FUS 100 FUS1 1 |
Period block definition: MANDT PERIODENBLOCK |
---|
(Client) (Per.block) |
300 FUS1 |
PB settings: MANDT PERIODENBLOCK FIKTCFNR STEPS ZEITEINH ABLAUFREL |
---|
(Client) (Per.block) (Fict.cf.no)(Steps)(Time unit)(Rel.outf) |
300 FUS1 100 01 02 10.00 |
300 FUS1 200 01 02 20.00 |
300 FUS1 300 01 03 20.00 |