Ansicht
Dokumentation

RJRPROBL - IS-M/SD: Problem Truck Routes

RJRPROBL - IS-M/SD: Problem Truck Routes

PERFORM Short Reference   ROGBILLS - Synchronize billing plans  
This documentation is copyright by SAP AG.
SAP E-Book

Description

This report determines truck routes that contain the selected problems for specific dates.

The following selections are possible:

  • Weight exceeded
  • Time exceeded (the truck route contains editions with an availability time after the truck route departure time)
  • Truck routes without drop-offs (truck route has no unloading points or has no drop-offs)

You can also select drop-offs without truck routes so that they can then be assigned to a truck route.

It is also possible to use the tolerance weight of the vehicle type assigned to the truck route.

You must specify a date and a plant for selection. The other fields are optional.

The following actions are possible:

  • Display functions for
  • Truck route
    Double click on the (split) truck route to display the basic data on the truck route

  • Unloading point
    Double click on the unloading point to display the basic data on the unloading point

  • Edition (drop-off)

  • Double click on the edition to display the basic data on the edition (issue)

The fields 'Truck route', 'Unloading point' and 'Drop-off' in the list are sensitive for these functions, meaning that an action is triggered by a double click on the fields.
The field 'No.PPacks' is also sensitive (see EXPAND).
  • Selection
    Selection of individual objects by positioning the cursor and clicking the 'Select' function or by double clicking on the appropriate line on a non-sensitive field.
  • Demarcation
    Same procedure as for selection except that the line was already selected (highlighted).
  • Deselect all
    All selections made previously are undone
  • Select block
    You can select the start of a block and must then select the end of a block (it is not possible to make individual selections between these two points). When selecting drop-offs, it is unimportant whether the start of the block is before or after the end of the block. If you select unloading points, this is taken into account in the sequence, so that an unloading point that comes before another in the block direction is also selected before it. This means, for example, that it is easy to change the order of the unloading points in a truck route by simply selecting a block from the last to the first unloading point and moving it to the truck route.
  • Read truck route
    Truck routes that do not contain problems can be read.
  • Split route
    Truck routes that have split routes can be split if this has not yet taken place.
  • Move
    You can move drop-offs or unloading points.
  1. Drop-offs were selected (logistical DT <> postal shipping)
    You can only move to one unloading point. The system displays a subscreen on which you can specify the number of bundles to be moved and whether or not the odd bundle is also to be moved in the case of a common odd bundle (the whole drop-off is always proposed as a default).
  2. Drop-offs were selected (logistical DT = postal shipping)
    You can only move to one unloading point. Here, there is no subscreen and the packs are moved directly to the new unloading point (no checks against the shipping schedule).






CL_GUI_FRONTEND_SERVICES - Frontend Services   BAL_S_LOG - Application Log: Log header data  
This documentation is copyright by SAP AG.

Length: 3965 Date: 20240531 Time: 173647     sap01-206 ( 59 ms )