RLWMPPC1 - WM-PP: Material Stock in Production Storage Bin
CPI1466 during Backup CL_GUI_FRONTEND_SERVICES - Frontend ServicesThis documentation is copyright by SAP AG.
Description
This report provides an overview of the quantity situation in production storage bins.
During the supply of material to production for materials to be picked directly for the order (mat.staging indicator 1), there is a logic that reduces the transported quantity during transfer order creation if an unrestricted-use quantity is identified in the storage bin.
Requirements
It only makes sense, of course, to determine the unrestricted-use quantity only in production storage bins that are supplied with material staging type 1 (picking directly for the order).
Output
The report calculates detailed figures for the stock in the storage bin (available quantity and quantity to be placed into stock), the open quantities in transfer requirements for the storage bin, and the requirements situation based on components that are needed at the respective production storage bin.
Example
Respective input data:
Warehouse number 001, Storage type 100, Storage bin PUB1-01-01
Plant 0001, Material MH-DESKBOX
Initial situation:
Production order 4711 for which 100 pieces of component MH-DESKBOX are needed. The component was requested fully and the consumption has already been posted for 50 pieces.
For transfer requirement 0815, a transfer order for 60 pieces has already been created and confirmed.
The stock in the storage bin is 10 pieces; 0 pieces are to be placed into stock.
This gives the following results:
Open TB quantity: 40 pcs (100 pcs - 60 pcs)
Available stock: 10 pcs
Qty for stock placement: 0 pcs
Reserved stock: 10 pcs (100 pcs - 50 pcs - 40 pcs)
Unrestricted-use qty: 0 pcs (10 pcs + 0 pcs - 10 pcs)