Ansicht
Dokumentation
RMAFRU00 - Postprocessing Incorrect Confirmations
General Material Data BAL Application Log DocumentationThis documentation is copyright by SAP AG.
Title
Reprocessing incorrect confirmations
Purpose
You can use this report to reprocess incorrect confirmations that, for example, were transferred from a PDC system or were entered with the help of the Cross-Application Time Sheet (CATS). If data was created that cannot be updated via the confirmation modules, error records are created by the system. These incorrect confirmations must be reprocessed.
Integration
This report can be called up from the following applications:
- HR (Time Management)
- PP (Production Orders)
- PM (Maintenance Orders)
- CS (Service Orders)
- PS (Networks)
- PP-PK (KANBAN)
- PP-PI (Process Orders)
- QM (QM Orders and Results Recording)
Prerequisites
You use functions in your system that can lead to the creation of error records.
Features
The report creates a list of worklists that contain confirmation records with errors. From the list, you can branch to the different processing transactions in the corresponding application.
For further information see the SAP Library under the confirmation documentation for the required application.
Activities
Records that are processed are given a processing indicator by the system.
ROGBILLS - Synchronize billing plans rdisp/max_wprun_time - Maximum work process run time
This documentation is copyright by SAP AG.
Length: 1608 Date: 20240531 Time: 173841 sap01-206 ( 28 ms )