Ansicht
Dokumentation

RPTCCXTEST - Test Data Transfer for Time Events

RPTCCXTEST - Test Data Transfer for Time Events

BAL_S_LOG - Application Log: Log header data   SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up  
This documentation is copyright by SAP AG.
SAP E-Book

Purpose

You can use this report to simulate and test entering time events and uploading data to the interface and database tables. You can run it in a test system only.

Integration

Prerequisites

Features

You can test the individual data transfer steps to the following interface and database tables:

  • CC1TEV interface table
  • EVHR interface table
  • TEVEN table
  • TEVEN_MORE table

You can use the following functions in the output list:

  • Record time events
    You can record personnel and work time events for an employee. You can use the Field selection for test program field to choose the fields for which you want to test the transfer of data to the HR-PDC and PP-PDC interfaces and to the tables.
    Regardless of the fields you choose, the output list already contains default entries, which you can overwrite or add to. You can enter personnel and work time events together, regardless of the selection you made on the report selection screen. The only exception is the HR-PDC with different payment option.
  • Upload
    You can upload recorded data to the interface tables CC1TEV and EVHR
  • Post
    You can post the recorded data to the TEVEN and TEVEN_MORE tables. The log of the posting via HR-PDC and/or PP-PDC is output depending on whether you posted personnel or work time events.
  • Time evaluation
    You can run time evaluation for the employee selected.

Selection






CPI1466 during Backup   BAL_S_LOG - Application Log: Log header data  
This documentation is copyright by SAP AG.

Length: 2224 Date: 20240601 Time: 025051     sap01-206 ( 37 ms )