Ansicht
Dokumentation
RSPARAGENER8 - Parallel Processing of the Generation of ABAP Loads
ROGBILLS - Synchronize billing plans SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3upThis documentation is copyright by SAP AG.
Purpose
Alongside the reports RSPARAGENLOD and RSPARAGENJOB, the report RSPARAGENER8 also belongs to the SAP Load Generator (SGEN: Generation of ABAP Loads and BSP Applications>). The report RSGENINVLAS (Automatic Generation of Invalidated Loads) also uses the report RSPARAGENER8. RSPARAGENER8 runs as a background job (scheduled by RSPARAGENJOB in transaction SGEN or by RSGENINVLAS). It runs as parallel jobs and splits the generation set into suitable subsets, which it then distributes to parallel jobs of the server group parallel_generators (the parallel jobs are realized as asynchronous RFCs of the function modules SUBST_GENER8_ABAP_LOADS or SUBST_GENER8_BSP_APPLS). Once all the objects in a subset have been generated, a parallel job is assigned a new subset. This is repeated until all objects of the generation set have been processed. The size of the subsets and number of parallel jobs are chosen to make efficient use of resources.
Integration
Prerequisites
Features
Selection
Standard Variants
Output
RSPARAGENER8 erzeugt zwei Protokolle:
- Messages concerning the start, termination, end and possibly errors of the generation process are output in the job log. Most messages have detailed long texts assigned to them.
- In addition, RSPARAGENER8 creates a spool request with an output list. This list contains information about the progress of the parallel processing, and information about the generation set and runtime statistics.
Activities
Example
CL_GUI_FRONTEND_SERVICES - Frontend Services General Material Data
This documentation is copyright by SAP AG.
Length: 2269 Date: 20240520 Time: 131416 sap01-206 ( 50 ms )