Purpose

The planned prices (planned price 1, 2 and 3) in the material master costing view can be updated by releasing costings as 'Other Prices'. You can use report SAPRCK_DELETE_PLANNED_PRICES to delete these again without having to make a material master change for each material. No change documents are created for the material master record in the process. The report checks whether the user has authorization to execute transactions CK24 and MM02.

If you specify a costing run in the selection, the system calculates the costings assigned to this costing run with the status 'Costed Without Errors' (KA) that also meet the further selection criteria (material, plant, valuation type).

Integration

Prerequisites

Features

Selection

Standard Variants

Output

Activities

Example






ROGBILLS - Synchronize billing plans   Vendor Master (General Section)  
This documentation is copyright by SAP AG.

Length: 1064 Date: 20240601 Time: 162545     sap01-206 ( 29 ms )