Ansicht
Dokumentation

AC_INT_ECS_ACP_FLD_BUDAT_PR_MN - Check: "Posting date is in prior period &, system date > 2nd working day" 2nd working day"" /> 2nd working day"" />

AC_INT_ECS_ACP_FLD_BUDAT_PR_MN - Check: "Posting date is in prior period &, system date > 2nd working day"

General Material Data   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.
SAP E-Book

This function module checks the following:

  • Whether the posting date specified is in the prior period
  • Whether the system date is after the 2nd working day of the current month

If both conditions are met, the system retains the posting date entered in the field. You can then formulate the check step in the auto correction processor as follows, for example:

If the posting date in the document = <GLE_ECS_ACP_FLD_BUDAT_PRIOR_MN>,

raise the following warning: You are posting a document to the prior period; check the dates entered





Parameters

E_FLG_FAILED
E_FLG_TRUE
I_BUDAT
I_CALID

Exceptions

Function Group

AC_INT_ECS_ACP_FLD_FUNC

PERFORM Short Reference   PERFORM Short Reference  
This documentation is copyright by SAP AG.

Length: 841 Date: 20240605 Time: 065944     sap01-206 ( 22 ms )