Ansicht
Dokumentation
AC_INT_ECS_ACP_FLD_BUDAT_PR_MN - Check: "Posting date is in prior period &, system date > 2nd working day"
General Material Data Fill RESBD Structure from EBP Component StructureThis documentation is copyright by SAP AG.
This function module checks the following:
- Whether the posting date specified is in the prior period
- Whether the system date is after the 2nd working day of the current month
If both conditions are met, the system retains the posting date entered in the field. You can then formulate the check step in the auto correction processor as follows, for example:
If the posting date in the document = <GLE_ECS_ACP_FLD_BUDAT_PRIOR_MN>,
raise the following warning: You are posting a document to the prior period; check the dates entered
Parameters
E_FLG_FAILEDE_FLG_TRUE
I_BUDAT
I_CALID
Exceptions
Function Group
AC_INT_ECS_ACP_FLD_FUNCPERFORM Short Reference PERFORM Short Reference
This documentation is copyright by SAP AG.
Length: 841 Date: 20240605 Time: 065944 sap01-206 ( 22 ms )