BAPI_BUS2176_MOVE - BAPI Checklist: Move Checklist Header
Fill RESBD Structure from EBP Component Structure TXBHW - Original Tax Base Amount in Local CurrencyThis documentation is copyright by SAP AG.
Functionality
You use this BAPI to move a checklist header (in the CHECKLIST_GUID parameter).
The superior project element of a checklist header is a phase or a project definition. The IV_TARGET_GUID required entry field must contain either the GUID of the superior phase or the GUID of the project definition, below which the checklist header is to be positioned.
Checklists can be positioned below the following project elements within a project:
Source Object | Possible Target Object | |
---|---|---|
Checklist below the project definition | not possible | |
Checklist below a phase | Phase |
The checklist header and its target object (phase, project definition) must be in the same project definition. If the source and the target objects are in two different project definitions, the system loads both project definitions in change mode. Processing is then canceled and the main objects remain loaded.
Example
Notes
Further information
Parameters
CHECKLIST_GUIDIV_TARGET_GUID
RETURN
Exceptions
Function Group
DPR_BUS2176rdisp/max_wprun_time - Maximum work process run time ABAP Short Reference