Ansicht
Dokumentation
BAPI_MATERIAL_STOCK_REQ_LIST - Material - Current Requirements/Stock List
TXBHW - Original Tax Base Amount in Local Currency Fill RESBD Structure from EBP Component StructureThis documentation is copyright by SAP AG.
Functionality
You use this method to select the current stock/requirements list of a material.
Depending on the control parameters of this method, the stock, requirements and receipt information for the material can be determined from the following planning environments:
- Stock/requirements list from operative planning:
- Material requirements planning
- Master production scheduling
- Stock/requirements list from long-term planning
The method selects all relevant stock, requirement, and receipt information for the material from the required planning environment.
As a result, the following is output:
- A list header of the main planning parameters for the material. This header has the same structure as the MRP list header.
- Details on all relevant MRP elements in the required formats
The following formats are supported for the detailed output:
- Detailed Dispay of the MRP Elements
The detailed display contains the planning-relevant parameters of all MRP elements that must be taken into account in the current planning environment.
- Single Line Display of the Requirements/Stock List (Presetting)
The single line display contains the information of the single line display of the corresponding dialog transactions for the display of requirements/stock lists.
- Period Totals Display of the Requirements/Stock List
The period totals display contains the information of the period totals display of the corresponding dialog transactions for the display of requirements/stock lists for the requested period.
Messages are returned in the Return parameter. The parameter documentation shows the return codes and their meanings.
Example
Notes
Authorization Check
- MRP: Authorization object M_MTDI_ORG
- Activity Types in MRP (Field MDAKT)
A- MRP/Master Production Scheduling: Display Requirements/Stock List
- Plant
- MRP controller
- Long-Term Plannning: Authorization object M_LFPL_ORG
- Activity Types in Long-Term Planning (field MDATL)
L4- Long-Term Planning: Display Requirements/Stock List
- Planning scenario
- Plant
Parameter Dependencies
- In systems with inactive MRP areas, the parameter Plant must be specified in addition to the parameter Material
- In systems with active MRP areas, you can specify either the parameter Plant or MRP_Area.
- If only the parameter Plant is filled, the system determines an aggregated plant view from the following information:
- Stock, requirements and receipt information of the plant MRP area
- All storage location and subcontractor MRP areas for the material in the specified plant
- If only the parameter MRP_Area is transferred, this method returns the current requirement/stock list of the specified MRP area (plant, storage location or subcontractor MRP area).
- If the parameters Plantand MRP_Areaare filled, the system carries out an availability check which can lead to an error message.
Additional Methods
- MRP List for the Material:Material.GetMRPList
- Planning a Material: Material.MaterialRequirementsPlanning
Customer Enhancements
The BAPI customer enhancement concept allows customers to include additional data that is not anticipated by the interface.
The ExtensionOut parameter is a data container, in which the additional values are sent during export.
Further information
For more information, see the SAP Library under Cross-Application Components -> Business Framework Architecture (CA-BFA) -> BAPI Programming Guide.
For more information on the BAPI customer enhancement concept, see the SAP Library under Cross-Application Components -> Business Framework Architecture (CA-BFA) -> Enhancements, Modifications, ... -> Customer Enhancement and Modification of BAPIs. This documentation describes the customer enhancement options and the procedure for the customer.
Parameters
/AFS/MRP_IND_LINES/AFS/MRP_ITEMS
/AFS/MRP_TOTAL_LINES
DISPLAY_FILTER
EXTENSIONOUT
GET_IND_LINES
GET_ITEM_DETAILS
GET_TOTAL_LINES
IGNORE_BUFFER
MATERIAL
MATERIAL_EVG
MATERIAL_LONG
MRP_AREA
MRP_CONTROL_PARAM
MRP_IND_LINES
MRP_ITEMS
MRP_LIST
MRP_STOCK_DETAIL
MRP_TOTAL_LINES
PERIOD_INDICATOR
PLANT
PLAN_SCENARIO
RETURN
SELECTION_RULE
Exceptions
Function Group
MRP1001TXBHW - Original Tax Base Amount in Local Currency CPI1466 during Backup
This documentation is copyright by SAP AG.