CBP_SOP_PLAN_SAVE_RFC - synchronous RFC to external planning system
SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up rdisp/max_wprun_time - Maximum work process run timeThis documentation is copyright by SAP AG.
Functionality
The current plan of the external planning system is saved. The current plan situation in the form of production figures is returned for saving on the R/3 database.
The steps executed within the external planning system is expected to be the following:
IF netchange flag is set.
extract production figures from current plan.
extract production figures from saved plan.
compare production figures from saved and current plan and
extract the changed production figures.
return changed production figures.
ELSE
extract the production figures from the current plan.
return current production figures.
ENDIF
save current plan to saved plan.
Example
Notes
If the single planning flag I_SOPCTR-SPLFLG was set on the pending request CBP_SOP_PLAN_REQUEST_RFC then only records in the table O_SOPTAB are expected from the external planning system, that were previously contained in the request, just with changed production figures. If the single planning flag was not set, additional records are expected from the external planning system.
If the net-change flag I_SOPCTR-NTCHNGFLG is set, then only the records with changed production figures are expected in the table O_SOPTAB from the external planning system. If the net-change flag is not set, all records with all production figures are expected from the external planning system.
The periods shall be the same as previously used in requesting the plan from the external planning system for all records in the table O_SOPTAB.
Further information
Parameters
I_SOPCTRO_SOPTAB
Exceptions
Function Group
CBP_SOPGeneral Material Data CPI1466 during Backup
This documentation is copyright by SAP AG.
Length: 2115 Date: 20240523 Time: 110322 sap01-206 ( 38 ms )