Ansicht
Dokumentation

ISU_CHECK_NEXT_EABL_IS_ESTIMD - Check Whether Next Meter Reading Result Was Estimated?

ISU_CHECK_NEXT_EABL_IS_ESTIMD - Check Whether Next Meter Reading Result Was Estimated?

ABAP Short Reference   BAL Application Log Documentation  
This documentation is copyright by SAP AG.
SAP E-Book

Functionality

The system checks whether or not the register is a balanced register and whether the subsequent meter reading result was estimated automatically for the same device and register.

If it is not a balanced register, the function sy-subrc = 0 und y_estimated = space is returned.

If it is a balanced register, message EL 463 and exception NEXT_MRRES_ESTIMATED are triggered and y_estimated = 'X' is set.

If an error occurs when requesting the next meter reading results, the caller is informed.

Example

See the call at the start of function ELCI::ISU_DETERM_ESTIM_VALUE.

Notes

currently (August 2002) only used to estimate meter reading results, but also provider during "normal" entry of results.

Further information





Parameters

X_REABLD
Y_ESTIMATED

Exceptions

NEXT_MRRES_ESTIMATED
NOT_QUALIFIED
SYSTEM_ERROR

Function Group

ELCI

Addresses (Business Address Services)   PERFORM Short Reference  
This documentation is copyright by SAP AG.

Length: 1080 Date: 20240523 Time: 091744     sap01-206 ( 24 ms )