Ansicht
Dokumentation
ISU_DEMAND03 - Break Down Demand with a Maximum Demand
ROGBILLS - Synchronize billing plans Fill RESBD Structure from EBP Component StructureThis documentation is copyright by SAP AG.
Operands
Input operands
DEMAND Demand
DEMAND Maximum demand
Output operands
DEMAND Demand filled up to the maximum demand
DEMAND Demand filled in excess of the maximum demand
Functionality
Breaking up of a demand into two demands. The first demand is filled up to the maximum demand and the second demand is filled with the remaining. The changes of the maximum demand in the billing period are taken into account.
Info Lines and Control Options
ZAHL1 = Demand
MASS1 = Dimension of the demand
ZAHL2 = Maximum demand
MASS2 = Dimension of maximum demand
ZAHL3 = First output demand
MASS3 = Dimension of first output demand
ZAHL4 = Second output demand
MASS4 = Dimension of second output demand
Example
The demand of an installation is measured by one register. The installation is used for household and business. There are different prices for the demand used for household and business.
Because only one register exists, a contracted maximum demand is defined. Every kWh up to this maximum demand has to be billed for household prices. Every kWh above this maximum demand will be billed for business prices.
Therefore at least two variants must follow this variant, usually DEMAND01.
Parameters
XY_OBJXY_SOBJ
X_OP
X_RED
X_SS
Exceptions
GENERAL_FAULTREGULAR_ERROR
Function Group
EV06Fill RESBD Structure from EBP Component Structure General Material Data
This documentation is copyright by SAP AG.
Length: 1710 Date: 20240523 Time: 134211 sap01-206 ( 32 ms )