ISU_DEMAND03 - Break Down Demand with a Maximum Demand

ISU_DEMAND03 - Break Down Demand with a Maximum Demand

ROGBILLS - Synchronize billing plans   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.
SAP E-Book

Operands

Input operands

DEMAND Demand
DEMAND Maximum demand

Output operands

DEMAND Demand filled up to the maximum demand
DEMAND Demand filled in excess of the maximum demand

Functionality

Breaking up of a demand into two demands. The first demand is filled up to the maximum demand and the second demand is filled with the remaining. The changes of the maximum demand in the billing period are taken into account.

Info Lines and Control Options

ZAHL1 = Demand
MASS1 = Dimension of the demand
ZAHL2 = Maximum demand
MASS2 = Dimension of maximum demand
ZAHL3 = First output demand
MASS3 = Dimension of first output demand
ZAHL4 = Second output demand
MASS4 = Dimension of second output demand

Updating the Active Indicator

Example

The demand of an installation is measured by one register. The installation is used for household and business. There are different prices for the demand used for household and business.

Because only one register exists, a contracted maximum demand is defined. Every kWh up to this maximum demand has to be billed for household prices. Every kWh above this maximum demand will be billed for business prices.

Therefore at least two variants must follow this variant, usually DEMAND01.





Parameters

XY_OBJ
XY_SOBJ
X_OP
X_RED
X_SS

Exceptions

GENERAL_FAULT
REGULAR_ERROR

Function Group

EV06

Fill RESBD Structure from EBP Component Structure   General Material Data  
This documentation is copyright by SAP AG.

Length: 1710 Date: 20240523 Time: 134211     sap01-206 ( 32 ms )