Ansicht
Dokumentation
ISU_UTILIT82 - Calculation of Reactive Loss for a Power Line
ROGBILLS - Synchronize billing plans General Data in Customer MasterThis documentation is copyright by SAP AG.
Functionality
This variant calculates the active power loss of a power line based on the formula:
- LLoss_R = (LC_A^2 + LC_R^2) * LL * LK / (LU^2 * T * WS * 1000)
The parameters are taken directly from the input operands (see below). Before executing the variant, you must have all necessary parameters and units of measurement.
Parameters | Unit of Measurement | Unit Characters | ||
---|---|---|---|---|
LLoss_R | Calculated reactive power loss | kvarh | ||
LC_A | Watt-hour consumption | kWh | ||
LC_R | Reactive energy consumption | kvarh | ||
T | Time portion in days (30 day rule) | |||
WS | Operating hours per day | |||
LL | Length of power line | km | ||
LK | Reactance of power line | Ohm/km | ||
LU | Voltage of power line | kV |
Operands and Their Meaning
Input Operands | Description | |
---|---|---|
QUANT | Watt-hour consumption of power line | |
QUANT | Reactive energy consumption of power line | |
INTEGER | Operating hours per day | |
REFVALUE | Length of power line | |
REFVALUE | Electricial coltage of power line | |
REFVALUE | Reactance of power line |
Output Operands | ||
---|---|---|
QUANT | Reactive energy losses of power line |
Info Lines and Control Options
You can use variant controls to determine whether information lines are output for active power losses.
The fields of the info lines contain the following values:
ZEITANT | Time portion according to 30 day rule | |
I_ZAHL1 | Watt-hour consumption | |
I_ZAHL2 | Reactive energy consumption | |
I_ZAHL3 | Reactive power loses | |
I_ZAHL4 | Operating hours per day |
Example
Notes
This variant covers special requirements for the Chinese market. This includes calculating the time portion according to what is called the 30 day rule: The time portion is set to the value <30 days> irrespective of the actual length of the billing period.
Exceptions:
- Move-in billing
- Move-out billing
- Interim billing
- The previous billing run executed for the contract was interim billing
- Simulation of billing without reference to a billing order
- The meter reading unit has changed since the previous billing run for the contract
- A billing-relevant change was made to the transformer characteristics (installation, removal, replacement, change of rate type, etc.) during the billing period
- The billing period contains a limitation by means of:
- A change to the rate category
- A change to the demand factor agreed to in the contract
- A price change during valuation of the power transformer losses, and so on.
For this reason, the variant can only be used for monthly billing.
You can use this variant as a template for your own variants.
Further information
Parameters
XY_OBJXY_SOBJ
X_OP
X_RED
X_SS
Exceptions
GENERAL_FAULTREGULAR_ERROR
Function Group
EV25PERFORM Short Reference PERFORM Short Reference
This documentation is copyright by SAP AG.
Length: 6659 Date: 20240523 Time: 103412 sap01-206 ( 46 ms )