Ansicht
Dokumentation
QM06_FM_TASK_CREATE_8DREPORT - Maßnahme: Erstellung eines 8D-Reports in Richtung Kunde (Folgeaktivität)
rdisp/max_wprun_time - Maximum work process run time Vendor Master (General Section)This documentation is copyright by SAP AG.
Functionality
This function module represents a standard follow-up function. It allows you to create an 8D Report for a customer from a notification.
An 8D Report can be printed for each defect item. The assignment of corrective tasks to the different sections (D = Directives) of the 8D Report is performed on the basis of the sort number for the tasks.
For example, if a corrective task has the sort number 4, then it will be printed in the 4th D of the 8D Report. In each field of the 8D Report , the corrective tasks with the corresponding sort numbers are printed.
The person responsible is the person reponsible for the task, and the person responsible for the cause is the person responsible for the notification.
The deadlines of the various tasks are determined as follows:
- If the task is already completed, the date of completion is also included with the supplement (comp.)
- If the task has not been completed, but a date for completion has been planned, then the planned end-date is included with the supplement (plan).
- If no date has been assigned to the task, "outstanding" is displayed.
If you wish to use your own form, assign your own form to the shop paper "8D_C" in print control of the quality notification.
Example
Further information
Parameters
E_BUCHE_QNQMAQMEL0
E_QNQMASM0
I_CUSTOMIZING
I_FBCALL
I_MANUM
I_VIQMEL
TE_CONTAINER
TE_LINES
TI_IHPA
TI_IVIQMFE
TI_IVIQMMA
TI_IVIQMSM
TI_IVIQMUR
Exceptions
ACTION_STOPPEDFunction Group
QM06CPI1466 during Backup Fill RESBD Structure from EBP Component Structure
This documentation is copyright by SAP AG.
Length: 1874 Date: 20240523 Time: 131659 sap01-206 ( 47 ms )