Ansicht
Dokumentation

RPM_PLMPS_UPLOAD - PLM PS project upload

RPM_PLMPS_UPLOAD - PLM PS project upload

General Material Data   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.
SAP E-Book

Functionality

This FM is used for uploading a project from PLM PS Project system to the xRPM system. For uploading a project from the PS system, an approved proposal/project has to be created in xRPM system. The project upload from the PS system will copy the tasks from the PS system to the xRPM system and also update some of the project fields.

During the upload some of the fields in xRPM project is updated from the PS project. The project fields like Plan Start and Plan Finish, Description etc are changed.

The tasks are either Updated, Inserted or deleted after checking with the tasks in the xRPM system. If a task coming from the PS system does not exist in the xRPM system then this is Inserted. If a task exist in the xRPM system and if it is not returned from the PS system, then this is deleted in the xRPM system. The decision for Update is taken by comparison of some specific fields between the PS and the xRPM system.

All the objects are updated, inserted, deleted in the buffer and finally saved by the Object manager.

Example

Notes

Further information





Parameters

ET_MSG
EV_MSG
EV_RC
IV_CHANGE_RESOURCE
IV_CHANGE_ROLE
IV_CHANGE_TASK
IV_CHANGE_TEAM
IV_DESTINATION
IV_LANGUAGE
IV_PS_PROJECT_ID
IV_RPM_PROJECT_ID
IV_SIMULATION

Exceptions

Function Group

RPM_PLMPS_IF

BAL Application Log Documentation   CPI1466 during Backup  
This documentation is copyright by SAP AG.

Length: 1578 Date: 20240605 Time: 110211     sap01-206 ( 48 ms )