Ansicht
Dokumentation

08814 - R: Antwort: OS Upgrade

08814 - R: Antwort: OS Upgrade

Vendor Master (General Section)   ROGBILLS - Synchronize billing plans  
This documentation is copyright by SAP AG.
SAP E-Book

R: Antwort: OS Upgrade

--- In DoNotReply@consolut.eu, "Peri Alberto" <vw000644Zf...>
wrote:
> Hi Christine,
>
> We have upgraded the IBM OS/400 from v.5 r.1 to v.5 r.2 from
November 2 2002 and I confirm that Mr.Thomas said (...write in this e-
mail) as reply to your question!
> I hope that IBM-SAP resolve this problems as soon as possible!!!
>
> Regards
>
> Alberto Peri
> Euroinvest Group
>
>
> -----Messaggio originale-----
> Da: thomas.kremminZs... [mailto:thomas.kremminZs...]
> Inviato: giovedì 9 gennaio 2003 9.10
> A: DoNotReply@consolut.eu
> Oggetto: Antwort: OS Upgrade
>
>
>
> Hi Christine,
>
> we jump from V5R1 to V5R2 and on this we do an hardware change too.
I think the release change to V5R2 should not be a problem. And our
systems keep runnig. But befor contacted SAP and IBM because I tink
that V5R2 will have some performance problems. As we find out and you
can see in a lot of mails in this group.
>
> regards
>
> Thomas
>
>
> |---------+---------------------------->
> | | Christine |
> | | Kramlich |
> | | <christinekZyorkt|
> | | wn.com> |
> | | |
> | | 08.01.2003 21:33 |
> | | Bitte antworten |
> | | an SAP on System i |
> |---------+---------------------------->
> >-----------------------------------------------------------------
-------------------------------------------------------------|
>
|
|
> | An: "'DoNotReply@consolut.eu'"
<DoNotReply@consolut.eu>
|
> |
Kopie:
|
> | Thema: OS
Upgrade
|
> >-----------------------------------------------------------------
-------------------------------------------------------------|
>
>
>
>
> Hi Gang,
>
> I was wondering if everyone could be so kind as to give me their
opinions on V5R2 versus V5R1? We are currently on V4R5 and plan on
upgrading or DEV machine to V5R1 in February and our PRD machine in
mid March. Since V5R1 support expires 5/31/03, I think it makes more
sense to jump straight to V5R2. To those that are on V5R2, was the
upgrade a major success with little or no problems on the SAP side of
things?
>
> Thanks,
> Christine
>
> Christine A. Kramlich
> Yorktowne Inc., Red Lion
> SAP Basis and AS/400 Administrator
> Phone: 717-246-5387
> Hi Christine,

Have a look at Note 392165. I am planning the same strategy as you
starting in March.

Dick
>
> Have a look to our homepage at: http://www.consolut.net
> DoNotReply@consolut.eu
>
>
>
>
>
> ------------------------ consolut Sponsor ---------------------
~--> Turn flat surfaces into speakers with the Soundbug.
http://us.click.consolut.net/QWAVSC/onCFAA/xGHJAA/dkFolB/TM
> --------------------------------------------------------------------
-~->
>
> Have a look to our homepage at: http://www.consolut.net
> DoNotReply@consolut.eu
>
> Your use of consolut is subject to
http://www.consolut.net


Durban Tours - Südafrika Safari

BAL Application Log Documentation   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.

Length: 4756 Date: 20240602 Time: 163358     sap01-206 ( 3 ms )