Ansicht
Dokumentation

ZCN0509 - E:The posting date for the liability posting must be confirmed. ( DCW )

ZCN0509 - E:The posting date for the liability posting must be confirmed. ( DCW )

ABAP Short Reference   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.
SAP E-Book


Message : ZCN0509
E:The posting date for the liability posting must be confirmed.

Message Long Text :
A posting date exists for the liability posting. The posting date is displayed in the format "Investment" and must be confirmed by pressing "Enter". The liability posting is "&1"; the confirmation code is "&2".

Message File : ZMSG
Library Message File : DCWL03


ROGBILLS - Synchronize billing plans   General Material Data  
This documentation is copyright by SAP AG.

Length: 3236 Date: 20240426 Time: 042158     sap01-206 ( 2 ms )