Ansicht
Dokumentation
CPA57A9 - Controller &24 failed. Probable remote system or network problem. (C G R) ( OS/400 )
Fill RESBD Structure from EBP Component Structure rdisp/max_wprun_time - Maximum work process run timeThis documentation is copyright by IBM.
Message : CPA57A9
Controller &24 failed. Probable remote system or network problem. (C G R)
Message Long Text :
Cause . . . . . : The probable causes are:
-- Remote system problem.
-- Network problem.
-- Local configuration problem.
Recovery . . . : Do one or more of the following:
-- Ask the remote system operator to verify the remote system configuration.
-- Ask the network operator to verify that the network is operating correctly.
-- Use the Change SDLC Line Description (CHGLINSDLC) command to increase the non-productive receive timer (NPRDRCVTMR parameter) value in line description &23.
If the problem continues, press F14 to run problem analysis.
Possible choices for replying to message . . . . . . . . . . . . . . . :
C -- Cancel recovery and inform any applications that are waiting for an operation that the recovery has been canceled.
G -- Start the automatic communications recovery again as defined by the communications recovery limit (CMNRCYLMT) parameter specified in the controller description.
R -- Try the operation one more time.
Technical description . . . . . . . . : The error log identifier is &22. The error code is &40. Error codes and their meanings follow:
44002618 -- The non-productive receive time-out lapsed for a short hold mode station.
Message File : QCPFMSG
Library Message File : QSYS2924
ROGBILLS - Synchronize billing plans rdisp/max_wprun_time - Maximum work process run time
This documentation is copyright by IBM.
Length: 3281 Date: 20240426 Time: 120026 sap01-206 ( 3 ms )