CPC8351 - IPL recovery of commitment definition &8 for job &19/&18/&17 completed. ( OS/400 )

CPC8351 - IPL recovery of commitment definition &8 for job &19/&18/&17 completed. ( OS/400 )

General Material Data   SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up  
This documentation is copyright by IBM.
SAP E-Book


Message : CPC8351
IPL recovery of commitment definition &8 for job &19/&18/&17 completed.

Message Long Text :

Cause . . . . . :
Recovery of the commitment definition that had been performed during the IPL or ASP device vary on completed.
If resynchronization is required to finish the logical unit of work, message CPI83D3 precedes this message for each remote location for which resynchronization is required. Resynchronization to these locations will be done in system database server jobs after the IPL or vary-on completes.
If this message is preceded by message CPI83D8, the commitment definition has been prepared instead of being committed or rolled back. Resynchronization must be performed to learn the commit or rollback decision from the remote location that owns the decision. Local resources with pending changes for the logical unit of work are locked until the decision to commit or roll back is known.
Technical description . . . . . . . . : The commitment definition identifier is &9.
The notify object for the commitment definition is &1 in library &2 type *&4 member &3.
The default journal associated with the commitment definition is &6 in library &7. If *N is specified for the default journal, there is no default journal. If there is a default journal, and journal entries were not specified to be omitted when this commitment definition was started, entries in the default journal indicate what resources were used in each logical unit of work.
The commit cycle identifier for the default journal is &26, which represents the last successfully committed transaction that brought commitment definition &8 to a commitment boundary. The commit cycle identifier is the sequence number of the 'SC' (commit cycle started) journal entry that corresponds to that particular transaction. If the commit cycle identifier is 0, either there is no default journal or any resources that were journaled to the default journal did not change during this logical unit of work. Journal entries written as a result of committable changes made during this logical unit of work can be displayed by specifying the commit cycle identifier on the CCIDLRG or CMTCYCID parameter of the Display Journal (DSPJRN) CL command.
The lock space id is &28.
The lock space associated space id is &29.
The XID is &30.

Message File : QCPFMSG
Library Message File : QSYS2924


ROGBILLS - Synchronize billing plans   ROGBILLS - Synchronize billing plans  
This documentation is copyright by IBM.

Length: 3271 Date: 20240426 Time: 043821     sap01-206 ( 2 ms )