Ansicht
Dokumentation
CPD325D - A sequence value to change multiple entries was not specified. ( OS/400 )
ROGBILLS - Synchronize billing plans ROGBILLS - Synchronize billing plansThis documentation is copyright by IBM.
Message : CPD325D
A sequence value to change multiple entries was not specified.
Message Long Text :
Cause . . . . . : A sequence value must be specified on an initial access path entry allowing the change multiple function to repeat the change for all access paths of the same sequence value group (1-99, *OPN, *HLD) and status condition (RUN, HELD, etc.). The change is applied to all access paths following the selected access path in the display list and having the same sequence value group and status condition as the selected access path.
Recovery . . . : Enter a sequence value on an access path with a value you wish repeated for all access paths that follow with the same sequence value group and status condition as the one selected.
Message File : QCPFMSG
Library Message File : QSYS2924
SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up BAL Application Log Documentation
This documentation is copyright by IBM.
Length: 3244 Date: 20240427 Time: 064223 sap01-206 ( 2 ms )