Ansicht
Dokumentation
CPI5739 - Invalid link level ERP combination for HPR. ( OS/400 )
Vendor Master (General Section) Fill RESBD Structure from EBP Component StructureThis documentation is copyright by IBM.
Message : CPI5739
Invalid link level ERP combination for HPR.
Message Long Text :
Cause . . . . . : The local system and the remote system have incompatible HPR link level error recovery capabilities.
Recovery . . . : If you must use HPR support between these systems, vary controller &1 off (VRYCFG command), and refer to the APPN Users Guide to determine which IOPs are compatible for HPR use.
Message File : QCPFMSG
Library Message File : QSYS2924
BAL Application Log Documentation CPI1466 during Backup
This documentation is copyright by IBM.
Length: 3225 Date: 20240426 Time: 112304 sap01-206 ( 2 ms )