Ansicht
Dokumentation

GHO_ALLOC - Authorization Object for OPM Activities


consolut Authorization for SAP
Easy Authorization Management for SAP

GHO_ALLOC - Authorization Object for OPM Activities

SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up   CPI1466 during Backup  
This documentation is copyright by SAP AG.
SAP E-Book

Definition

The authority is checked based on the activity number for GHO_ALLOCauthority object and the display/change/create authorizations for authority object for network object I_BEGRP.

Defined fields

Activity Number   Activity Text
01   Allocation run/Allocation Results
02   Allocation Rules
03   Capture Measurement
04   Well Test / PQ Curve
05   Chemical Analysis
06   Prior Period Notification
07   Maintenance Retrieval Hierarchy
08   Simulation
09   Reset PPN

For example, if you have authorization to display a network object and activity 1 is assigned, then you can display the allocation results. If you do not have display authorization, then results are not displayed. In the case of allocation results the authorization check is only for display whereas for allocation run create or change authorizations are checked.

Operation   Authorization in Network Object     Authority required for OPM Activity
Allocation Pre processing POWL   Create/Change     1
Allocation PPN POWL   Create/Change     6
Allocation POWL Results   Display     1
Simulation   Create/Change     8
MRH Rules   Change/Display     7
Allocation Rules   Change/display     2
Capture Measurement   Change/Display     3
Reset PPN   Create/Change     9

  1. For allocation pre-processing POWL
The OPM activity 1 along with create /change authority for network object is checked. Only if you have authorization to create/change and assigned the OPM activity 1, then you can create or change allocation pre-processing POWL.
  1. For allocation PPN POWL
The OPM activity 6 along with create /change authority for network object is checked. Only if you have authorization to create/change and assigned the OPM activity OPM 6, then you can create or change the allocation PPN POWL.
  1. For allocation POWL results
The OPM activity 1 along with display authority is checked. Only if you have authorization to display and assigned the OPM activity 1, then you can display the allocation POWL results.
  1. For simulation
The OPM activity 8 along with create /change authority is checked. Only if you have authorization to create/change and assigned the OPM activity 8, then you can create or change simulation preparation.
  1. For MRH
The OPM activity 7 along with display /change authority is checked. Only if you have authorization to display/change and assigned the OPM activity 7, then you can create or change MRH rules. At the initial point after entering data on the initial screen the above authorization is checked for all the objects in production network. If any object does not have the required authorization, it is removed from the list. Furthermore if you have only display authorization, the screens will be in read only mode, and if you have change authorization the screens will be in change mode. Only if you have authorization to display/change and assigned the OPM activity 7 the MRH button is enabled.
  1. For allocation rules (production network, node, UoM, well completion override)
The OPM activity 2 along with display /change authority is checked. Only if you have authorization to display/change and assigned the OPM activity 2, then you can create or change allocation rules. At the initial point after entering data on the initial screen the above authorization is checked for all the objects in production network. If any object does not have the required authorization, it is removed from the list. Furthermore if you have only display authorization, the screens will be in read only mode, and if you have change authorization the screens will be in change mode.
  1. For measurement capture for well test / PQ curve
The OPM activity 4 along with display /change authority is checked. Only if you have authorization to display/change and assigned the OPM activity 4, then you can create or change well test / PQ curve. . For measurement capture for chemical analysis the OPM activity 5 along with display /change authority is checked. Only if you have authorization to display/change and assigned the OPM activity 5, then you can create or change chemical analysis. For measurement capture of actual quantity, planned quantity and so on, the OPM activity 3 along with display /change authority is checked. Only if you have authorization to display/change and assigned the OPM activity 3, then you can create or change the other measurements. If for any object you do not have the required authorization, a message is displayed. Furthermore if you have only display authorization, the screens will be in read only mode, and if you have change authorization the screens will be in change mode.
  1. For reset PPN
The OPM activity 9 along with create /change authority is checked. Only if you have authorization to create/change and assigned the OPM activity 9 the reset PPN button is enabled.






consolut Authorization for SAP
Easy Authorization Management for SAP


CL_GUI_FRONTEND_SERVICES - Frontend Services   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.

Length: 8498 Date: 20240523 Time: 082656     sap01-206 ( 120 ms )