Ansicht
Dokumentation
GHO_ALLOC - Authorization Object for OPM Activities
SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up CPI1466 during BackupThis documentation is copyright by SAP AG.
Definition
The authority is checked based on the activity number for GHO_ALLOCauthority object and the display/change/create authorizations for authority object for network object I_BEGRP.
Defined fields
Activity Number | Activity Text | |
---|---|---|
01 | Allocation run/Allocation Results | |
02 | Allocation Rules | |
03 | Capture Measurement | |
04 | Well Test / PQ Curve | |
05 | Chemical Analysis | |
06 | Prior Period Notification | |
07 | Maintenance Retrieval Hierarchy | |
08 | Simulation | |
09 | Reset PPN |
For example, if you have authorization to display a network object and activity 1 is assigned, then you can display the allocation results. If you do not have display authorization, then results are not displayed. In the case of allocation results the authorization check is only for display whereas for allocation run create or change authorizations are checked.
Operation | Authorization in Network Object | Authority required for OPM Activity | |||
---|---|---|---|---|---|
Allocation Pre processing POWL | Create/Change | 1 | |||
Allocation PPN POWL | Create/Change | 6 | |||
Allocation POWL Results | Display | 1 | |||
Simulation | Create/Change | 8 | |||
MRH Rules | Change/Display | 7 | |||
Allocation Rules | Change/display | 2 | |||
Capture Measurement | Change/Display | 3 | |||
Reset PPN | Create/Change | 9 |
- For allocation pre-processing POWL
- The OPM activity 1 along with create /change authority for network object is checked. Only if you have authorization to create/change and assigned the OPM activity 1, then you can create or change allocation pre-processing POWL.
- For allocation PPN POWL
- The OPM activity 6 along with create /change authority for network object is checked. Only if you have authorization to create/change and assigned the OPM activity OPM 6, then you can create or change the allocation PPN POWL.
- For allocation POWL results
- The OPM activity 1 along with display authority is checked. Only if you have authorization to display and assigned the OPM activity 1, then you can display the allocation POWL results.
- For simulation
- The OPM activity 8 along with create /change authority is checked. Only if you have authorization to create/change and assigned the OPM activity 8, then you can create or change simulation preparation.
- For MRH
- The OPM activity 7 along with display /change authority is checked. Only if you have authorization to display/change and assigned the OPM activity 7, then you can create or change MRH rules. At the initial point after entering data on the initial screen the above authorization is checked for all the objects in production network. If any object does not have the required authorization, it is removed from the list. Furthermore if you have only display authorization, the screens will be in read only mode, and if you have change authorization the screens will be in change mode. Only if you have authorization to display/change and assigned the OPM activity 7 the MRH button is enabled.
- For allocation rules (production network, node, UoM, well completion override)
- The OPM activity 2 along with display /change authority is checked. Only if you have authorization to display/change and assigned the OPM activity 2, then you can create or change allocation rules. At the initial point after entering data on the initial screen the above authorization is checked for all the objects in production network. If any object does not have the required authorization, it is removed from the list. Furthermore if you have only display authorization, the screens will be in read only mode, and if you have change authorization the screens will be in change mode.
- For measurement capture for well test / PQ curve
- The OPM activity 4 along with display /change authority is checked. Only if you have authorization to display/change and assigned the OPM activity 4, then you can create or change well test / PQ curve. . For measurement capture for chemical analysis the OPM activity 5 along with display /change authority is checked. Only if you have authorization to display/change and assigned the OPM activity 5, then you can create or change chemical analysis. For measurement capture of actual quantity, planned quantity and so on, the OPM activity 3 along with display /change authority is checked. Only if you have authorization to display/change and assigned the OPM activity 3, then you can create or change the other measurements. If for any object you do not have the required authorization, a message is displayed. Furthermore if you have only display authorization, the screens will be in read only mode, and if you have change authorization the screens will be in change mode.
- For reset PPN
- The OPM activity 9 along with create /change authority is checked. Only if you have authorization to create/change and assigned the OPM activity 9 the reset PPN button is enabled.
CL_GUI_FRONTEND_SERVICES - Frontend Services Fill RESBD Structure from EBP Component Structure
This documentation is copyright by SAP AG.
Length: 8498 Date: 20240523 Time: 082656 sap01-206 ( 120 ms )