Ansicht
Dokumentation
Displaying scrap in the Costing Results ( RELN40A_COPC_REJECTS )
Vendor Master (General Section) PERFORM Short ReferenceThis documentation is copyright by SAP AG.
Short text
Displaying scrap in the Costing Results
Description
When you plan scrap in the master data of Logistics, the costs of the planned scrap are included in costing.
From Release 4.0A, you can display the costs of the planned scrap in the itemization - and thus also in the costed multilevel BOM - separately. Displaying scrap costs separately in the costing results makes it easier to plan and analyze costs.
Damage caused to data by errors
Software/hardware requirements
Installation information
Effects on System Administration
Effects on Customizing
Effect on batch input
Changes to the Interface
Changes in procedure
Procedure for removing dataset errors
Dependent functions
Planning
Further notes
Further information on costing scrap and displaying planned scrap in the itemization and costed multilevel BOM is available in the documentation for Product Cost Planning and for the Information System for Product Cost Controlling in the R/3 Library.
General Material Data Addresses (Business Address Services)
This documentation is copyright by SAP AG.
Length: 1617 Date: 20240426 Time: 085826 sap01-206 ( 30 ms )