Ansicht
Dokumentation
Maintenance of Time- and BOM-dependent Routing Parameters ( RELN40A_PP-ROUTING )
ABAP Short Reference ABAP Short ReferenceThis documentation is copyright by SAP AG.
Short text
Maintenance of Time- and BOM-dependent Routing Parameters
Description
With Release 4.0A, time-dependent maintenance of the scrap factor, cycle time, and load factor is possible through a predefined period split either in the material master or the routing.
Data is saved in the PLPLAN_PARAM table. You can save the parameters either to a standard routing, or to a standard routing connected to a BOM. When the plan is disaggregated, the scrap factors that were originally maintained in the plan, as well as standard values 1 and 2, will be temporarily overwritten.
You can carry out this transaction in the process overview of the routing or through material planning 2 in the material master.
It is only possible to maintain data for standard routings. Referenced routings with referenced operations, for example, cannot yet be maintained.
Software/hardware requirements
Installation information
Effects on System Administration
Effects on Customizing
No changes in Customizing are required.
Changes in procedure
Dependent functions
Planning
Further notes
PERFORM Short Reference CL_GUI_FRONTEND_SERVICES - Frontend Services
This documentation is copyright by SAP AG.
Length: 1400 Date: 20240426 Time: 221527 sap01-206 ( 42 ms )