Ansicht
Dokumentation

ATP check in PP/DS (new) ( RELNAPO_310_PPS_ATPCHECK )

ATP check in PP/DS (new) ( RELNAPO_310_PPS_ATPCHECK )

General Material Data   SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

ATP check in PP/DS (new)

Use

In SAP APO 3.1 you can execute an ATP check for the following orders in the active planning version 000 in Production Planning and Detailed Scheduling (PP/DS):

  • In-house production orders
For an in-house production order (planned order or production order), the system checks the quantity in which the order components planned in SAP APO are available. The ATP check can derive a confirmed quantity for each order product by using a correlation calculation using the component quantities confirmed at the requirements date, that is, it can derive the quantity of the order product that the component can actually supply on the order availability date.
  • Stock transport requisitions
For each order item in a stock transport requisition, the system checks the quantity in which the product to be transferred can be confirmed in the source location.

The system checks if it is possible to make a total delivery of the order on the availability date. It is not possible to split the order into available partial quantities.

For the ATP check, you can use the product availability check and the check against forecasting. Products that are planning relevant are those for which you have specified a check mode and an ATP group in the location product master.

The ATP check is integrated in the following PP/DS applications:

  • Interactive planning
You can call up the ATP check in the product view, in the order processing view, in the receipt view or in Planned Order Management.
  • Order opening
In the SAP APO system, you can trigger the opening of production orders and stock transfer orders in the SAP R/3 system. For the conversion of planned orders and stock transport requisitions into production orders or stock transport orders, the system can automatically execute an ATP check on the basis of a conversion rule for the planned orders or for the stock transport requisitions. You can make user-specific settings that the system should only allow the opening if all the components are fully confirmed.

Effects on Existing Data

Effects on Data Transfer

Effects on System Administration

Often in SAP APO 3.0A, planned orders and stock transport requisitions are transferred to the SAP R/3 system so that an ATP check can be executed there. If you are using SAP APO 3.1, check if it is now sufficient to transfer only the orders for which the conversion indicator is set, into the SAP R/3 system. You can make the relevant settings in the customizing for Production Planning and Detailed Scheduling under Maintain Global Parameters and Defaults.

Effects on Customizing

  • Business events
You can use various business events to control the ATP check in PP/DS according to which order type is being checked (planned order, production order or stock transport requisitions), and if the ATP check should be executed with or without a conversion check. For example, you make different checks on production orders than on planned orders. You define business events in the customizing for the Global Availability Check (Global ATP Check) under Maintain Business Events and enter them in the customizing for Production Planning and Detailed Scheduling under Maintain Global Parameters and Defaults.
  • ATP check for order opening
You can use a conversion rule to specify that the SAP APO system should execute an ATP check during the conversion of a planned order or a stock transport requisition into a produciton order or a stock transport order. You define conversion rules in the customizing for Production Planning and Detailed Scheduling under Maintain Conversion Rules. You can enter a globally valid conversion rule in the customizing for Production Planning and Detailed Scheduling under Maintain Global Parameters and Defaults. In the location product master, you specify the conversion rule that is valid for a product. Using the roles that you assign to the user, you specify if the user can also execute conversion if there are missing components.
  • Sequence when checking several orders
The order confirmation results can depend on the sequence in which the system executes the ATP check. You use a sort profile to specify this sequence. You define sort profiles in the customizing for Production Planning and Detailed Scheduling under Maintain Sort Profile.

Further Information

Release Information Checks with order opening






RFUMSV00 - Advance Return for Tax on Sales/Purchases   General Material Data  
This documentation is copyright by SAP AG.

Length: 6413 Date: 20240427 Time: 010642     sap01-206 ( 92 ms )