Detailed Scheduling Strategies (enhanced) ( RELNAPO_310_PPS_DS )

Detailed Scheduling Strategies (enhanced) ( RELNAPO_310_PPS_DS )

ABAP Short Reference   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Detailed Scheduling Strategies (enhanced)

Use

The strategy profile has been enhanced as follows for SAP APO 3.1, to control new and enhanced planning functions in various application areas of Production Planning and Detailed Scheduling (PP/DS):

  • Infinite scheduling with planning-related minimum intervals
Previously, the process-related minimum intervals between activities were considered for scheduling in detailed scheduling, under consideration of time relationships. In SAP APO 3.1, infinite scheduling on the basis of - larger - planning-related minimum intervals is possible for order-internal relationships. You can create a plan that allows enough space for later finite detailed scheduling. You maintain planning-related minimum intervals in the plan (production process model or iPPE). For the runtime object, the system can determine planning-related minimum intervals from routing data in SAP R/3. When planning under consideration of order-internal relationships, the system uses the planning-related minimum intervals if you have set the Use planning-related minimum intervals for infinite scheduling indicator in the detailed scheduling strategy.
  • Considering cross-order relationships
Previously only order-internal relationships could be considered in detailed scheduling. In SAP APO 3.1 you can also consider cross-order relationships. Cross-order relationships are relevant for subcontracting, for example. This is mapped by an in-house production order in the subcontractor's plant and a stock transport order between the subcontractor's plant and your own plant. The last activity of the in-house production order and the first activity of the stock transport order are linked by a cross-order relationship. You specify if the system should consider cross-order relationships in detailed scheduling, using the cross-order relationships field in the detailed scheduling strategy.
  • Block planning with buckets
In SAP APO 3.1, you can use block planning with buckets. You can choose to finitely schedule the bucket capacity or the time-continuous capcity of single-mixed resources whose bucket capacity is derived from blocks. You specify which capacity should be finitely scheduled using the new finite capacity field in the detailed scheduling strategy. For finite scheduling of the bucket capacity there is a new finite scheduling mode find buckets with free capacity. For more information, see release information on Block Planning.
  • Interuptability of campaigns
In SAP APO 3.1 you can use the consider campaign requirements indicator in the detailed scheduling strategy to specify if the system can interupt campaigns on campaign-relevant single resources with operations that do not belong to the campaign. You specify if a single resource is campaign relevant using the campaign relevant indicator in the resource. For more information, see the release information on Campaign Planning.
  • Restructuring of the strategy profile
The strategy profile has been restructured for SAP APO 3.1, as follows:
  • The settings that are valid for all the detailed scheduling strategies in the strategy profile are on the Cross-strategy Settings tab page.

  • Strategy-specific settings that are valid for planning selected objects are on the General Settings tab page.

  • The strategy-specific settings for dependent objects are on the Strategy parameters for dependent objects tab page.

Effects on Existing Data

Effects on Data Transfer

Effects on System Administration

Effects on Customizing

Further Information






Addresses (Business Address Services)   ROGBILLS - Synchronize billing plans  
This documentation is copyright by SAP AG.