Ansicht
Dokumentation
Detailed Scheduling Planning Board (enhanced) ( RELNAPO_310_PPS_DS_PB )
TXBHW - Original Tax Base Amount in Local Currency Fill RESBD Structure from EBP Component StructureThis documentation is copyright by SAP AG.
Short text
Detailed Scheduling Planning Board (enhanced)
Use
The following enhancements have been made to the detailed scheduling planning board (DS planning board) in SAP APO 3.1:
- Configuration
- Under Settings -> Profile, you can change the following profiles during a planning board session, without ending and restarting the DS planning board: strategy profile, planning board profile, time profile, optimization profile, heuristic profile, alert monitor profile and key figure schema.
- Previously, a chart for a network view or for a curve view could be a static or a dynamic chart. You specified if a network or curve view chart was a static or a dynamic chart using the dynamic chart indicator in the planning board profile. In SAP APO 3.1, network or curve view charts are dynamic charts that you can hide or display in the planning board, as required. Charts for activities, operations or orders are, as before, static charts. The dynamic chart indicator now only has the function of specifying if a chart is displayed when the planning board is called up. It has therefore been renamed do not display chart when calling up the planning board.
- Selecting objects
- Under Edit -> Select -> More you can
- select networked operations, order and campaigns for the selected objects
- call up a customer-specific selection function under user
- You implement the selection logic in the new customer exit APOCDPS8. To implement the customer exit, call up the Select Objects in the DS Planning Board activity under Enhancements in the customizing for Production Planning and Detailed Scheduling (PP/DS).
- Planning information
- Under Extras -> Logs you can access the planning log. Previously, you could only call up this log in the order view and in the area menu for Production Planning. In the planning log, lists the messages that have occured during planning using a heuristic.
- In SAP APO 3.1, cross-order relationships can be considered during detailed scheduling. These relationships are displayed in the DS planning board by yellow lines. For more information, see the release information for Detailed Scheduling Strategies.
- Enhancements for campaign planning and buffer planning
- In SAP APO 3.1, there are new and changed planning functions, planning information and display options in the DS planning board, that are specific to campaign planning. For more information, see the release information for Campaign Planning and for Buffer Planning.
Effects on Existing Data
Effects on Data Transfer
Effects on System Administration
Effects on Customizing
Further Information
Vendor Master (General Section) General Material Data
This documentation is copyright by SAP AG.
Length: 4603 Date: 20240426 Time: 174054 sap01-206 ( 77 ms )