Ansicht
Dokumentation

Changes in Posting of Fixed Portions ( RELNCO_COOM_40A_FIXANT )

Changes in Posting of Fixed Portions ( RELNCO_COOM_40A_FIXANT )

BAL Application Log Documentation   BAL Application Log Documentation  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Changes in Posting of Fixed Portions

Description

In Release 3.0/3.1, order and project planning included fixed portions in posting of total costs/quantities ot receivers. Separation of these into fixed and variable portions was not useful because they did not participate in activity output.

In Release 4.0, the R/3 System no longer posts fixed quantities and fixed costs. This does not mean they are meant to be variable; from an SAP standpoint, the costs are simply undefined. The user must divide them during allocation to an activity-producing object into fixed and variable.

There are no changes in manual planning entry and display.

In activity allocation, however, the allocated costs include a portion which is already fixed in relation to the sender object. This remains fixed in further cost flows. Therefore, the R/3 System posts this portion as fixed costs (from a sender standpoint) to the receiver as well. The difference between total and fixed costs remains undefined.

From a sender standpoint, there is no fixed quantity portion. It posts as total/undefined. In contrast with 3.0/3.1, this is also the case in Release 4.0 for indirect activity allocation as well.






BAL Application Log Documentation   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.

Length: 1324 Date: 20240520 Time: 230549     sap01-206 ( 33 ms )