Ansicht
Dokumentation

Automatic Supply-to-Production (Enhanced) ( RELNDIMP471_S2P )

Automatic Supply-to-Production (Enhanced) ( RELNDIMP471_S2P )

General Data in Customer Master   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Automatic Supply-to-Production (Enhanced)

Use

As of DIMP 4.71, the following enhancements to automatic supply-to-production are available:

  • Automatic Supply-to-Production with ERP Requirements
    Until now, you could only work with requirements from SAP APO for automatic supply-to-production. Without SAP APO, you could only calculate the replenishment using the minimum stock level (consumption-based material staging).

    With this enhancement, you can now also work with requirements from SAP ERP (dependent requirements, manual reservations, dependent reservations and summarized JIT calls created by production orders) in the automatic supply-to-production function. Note that sales order stocks and project stocks cannot be processed.

    You can define per material whether you want to work with APO requirements or with ERP requirements. To work with both APO and ERP requirements simultaneously, SAP provides you with the Business Add-In S2L_PSEG_CTR_FACTORY.
  • Deleting All Replenishment Proposals for a Supply Segment
    Until now, you could only delete replenishment proposals individually. Now it is possible to select a supply segment and delete all the replenishment proposals (also fixed ones) for this segment.
  • Grouping Planning Elements
    A huge number of planning elements within a planning horizon can mean that an overview of the supply-to-production table is difficult. Therefore, you can group planning elements by time sequence and type (such as dependent requirements or summarized JIT calls). The individual quantities of the planning elements are added in this process.

    The planning element created by the grouping only exists on the interface and has no effect on the missing quantities calculation which is still based on the individual planning elements.

    Grouped replenishment elements are displayed with the date of the latest element included in the grouping. Grouped requirements are displayed with the date of the earliest requirement included in the grouping.
  • Creating Replenishment Proposals for Control Cycles of the Category: Manual Summarized JIT Call
    Until now, in the supply-to-production table, you were only able to display the current situation for supply segments based on the control cycle category manual summarized JIT call. With this enhancement, you can now also create summarized JIT calls manually in the supply-to-production table.
    Note that any supply segments based on the control cycle category manual summarized JIT call are not taken into account in automatic planning.

    Note that batches are not supported in the supply-to-production table.
  • Overwriting the Planning Horizon
    The planning horizon defines the period in which missing quantities are calculated for requirements-based supply-to-production. Until now, you defined the planning horizon in the control cycle as a relative period of time. The end of the planning horizon is calculated on the basis of the shift program and a factory calendar in ERP
    With this enhancement, you can maintain a planning horizon in the supply-to-production table (or when starting the transaction) that overwrites the planning horizon of all or individual requirements-based control cycles. If you also use this planning horizon for consumption-based supply segments, these segments are treated as requirements-based supply segments.

    You can also reset these settings so that the calculation is again made on the basis of the planning horizon saved in the control cycle.
  • Product Interchangeability and Phantom Assemblies
    The automatic supply-to-production supports product interchangeability and also phantom assemblies in SAP APO. For more information on this topic, please refer to the corresponding Release Information.
  • Business Add-Ins (BAdIs) for the Automatic Supply-to-Production
    The following BAdIs are available in the Implementation Guide:

Effects on Existing Data

Effects on Data Transfer

Effects on System Administration

Effects on Customizing

Further Information






CL_GUI_FRONTEND_SERVICES - Frontend Services   BAL_S_LOG - Application Log: Log header data  
This documentation is copyright by SAP AG.

Length: 6321 Date: 20240520 Time: 203954     sap01-206 ( 99 ms )