Ansicht
Dokumentation
Processing of assets ( RELNJVA_31H_CUTBACK )
Fill RESBD Structure from EBP Component Structure PERFORM Short ReferenceThis documentation is copyright by SAP AG.
Short text
Processing of assets
Description
A new processing option Perform asset postings has been added to the cutback process.
If cutback is run with this option cutback will process the cutback postings against assets in two steps:
- The original costs or revenues accumulated on the assets are cut back to the partners with an offset to a cutback account that must be defined in the cutback mapping table.
- The cutback account is cleared against the original assets.
If cutback is run without this option, only the first step from above will be processed.
In the previous release cutback did automatically always run with postings against assets (identical to the first option).
Example
The following example uses an equity E1 in venture V1 with the following partners:
Operator OP with 60%
Partner P1 with 30%
Partner P2 with 10%
It is also assumed that expenses occurred to the following assets within this venture and equity group:
asset A1-1 5,000 USD
asset A1-2 10,000 USD
Both assets are assigned to reconciliation account 20000 which is mapped to cutback account 699020.
Cutback postings with asset processing would then look like:
PK
Account/Asset BI RI Amount
01 P1
4 4,500
01 P2
4 1,500
50 699020 CB 6,000-
PK
Account/Asset BI RI Amount
40 699020 CB 6,000
75 A1-1
CB 2,000-
75 A1-2
CB 4,000-
Cutback postings without asset processing would look like:
PK
Account/Asset BI RI Amount
01 P1
4 4,500
01 P2
4 1,500
50 699020 CB 6,000-
The posting keys, billing indicators, and recovery indicators used in the example above may be different based on the configuration of the posting rules.
Damage caused to data by errors
Software/hardware requirements
Installation information
Effects on System Administration
Effects on Customizing
Effect on batch input
Changes to the Interface
Changes in procedure
Procedure for removing dataset errors
Dependent functions
Planning
Further notes
SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up ABAP Short Reference
This documentation is copyright by SAP AG.
Length: 5230 Date: 20240603 Time: 101632 sap01-206 ( 34 ms )