Ansicht
Dokumentation

LIS: Function "Change information structure" in standard analyses ( RELNLIS_30A_ALLG_WECHSEL )

LIS: Function "Change information structure" in standard analyses ( RELNLIS_30A_ALLG_WECHSEL )

General Data in Customer Master   CPI1466 during Backup  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

LIS: Function "Change information structure" in standard analyses

Description

As of Release 3.0B, in the standard analyses of all information systems of LIS (Purchasing Information System, Sales Information System, Inventory Controlling, Shop Floor Information System, Plant Maintenance Information System, Quality Management Information System) you can change the information structure and move from an individual information system to the entire LIS. Moving around between information systems is now easy and user-friendly.

Jumping into another information structure allows you to:

  • obtain more detailed information which is contained in another information structure for aggregated information that is stored in the information structure of the standard analysis.
Example:
You perform a standard analysis which is based on the information structure with the characteristics Plant and Storage Location. You want, however, to analyze the materials for a particular storage location. Thus, directly from the standard analysis, you can call up another information structure which contains information on material level.
  • obtain information from other functional areas
Example:
You want to analyze data in the Purchasing Information System for a particular material from Inventory Management. For any data selection from the Purchasing Information System, you can use the function Change information structure to easily jump to an information structure from Inventory Controlling and display performance figures for the stock situation.
  • change to an information structure whose data is updated in another time unit
Example:
You execute a standard analysis that is based on data updated on a monthly basis. You can now change to the information structure whose data is updated exactly to the day.

When changing the information structure or standard analysis, the following selection criteria of the initial standard analysis are also copied:

  • characteristic values
The characteristic values, that are entered on the selection screen of the initial standard analysis, as well as the characteristic values, that were determined by the drill-down and, if necessary, the position of the cursor, are transferred to the standard analysis you switch to. That is, they are used there to select data.
You obviously cannot give any key figures to characteristics, which, although they exist in the initial standard analysis, are not in the standard analysis to which you switched to.
  • period to analyze
The period to analyze of the standard analysis you change to is determined by the system.

Damage caused to data by errors

Software/hardware requirements

Installation information

Effects on System Administration

Effects on Customizing

Effect on batch input

Changes to the Interface

Changes in procedure

Procedure for removing dataset errors

Dependent functions

Planning

Further notes

For further information on the function Change information structure, and its usage, please refer to the WinHelp document LO - Logistics Information System.






CPI1466 during Backup   TXBHW - Original Tax Base Amount in Local Currency  
This documentation is copyright by SAP AG.

Length: 3958 Date: 20240603 Time: 051347     sap01-206 ( 87 ms )