Ansicht
Dokumentation

Equipment installation/dismantling and aligning equipment hierarchies. ( RELNPM_30D_EQM_INSTALLAT )

Equipment installation/dismantling and aligning equipment hierarchies. ( RELNPM_30D_EQM_INSTALLAT )

Addresses (Business Address Services)   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Equipment installation/dismantling and aligning equipment hierarchies.

Description

For Release 3.0D, the functions for installing/dismantling pieces of equipment at a functional location and the functions for the structuring of equipment hierarchies have been integrated closer with each other, enhanced and simplified.

In detail, this means:

  • The screen previously divided into two for the installation of a piece of equipment at a functional location has been replaced by the dialog box Change InstallLocation.
  • The Structure menu has been simplified.
  • As far as the structuring of an equipment hierarchy is concerned, it is no longer described as an assignment of sub-equipment to a superior equipment, but instead as a installation of a sub-equipment in a superior equipment.
  • Item numbers can be entered for pieces of equipment in a superior equipment as well as for pieces of equipment at functional locations.
  • When a piece of equipment is being installed in a superior equipment at a functional location, you can enter the date and the exact time.

Damage caused to data by errors

Software/hardware requirements

Installation information

Effects on System Administration

Effects on Customizing

Effect on batch input

Changes to the Interface

Changes in procedure

Procedure for removing dataset errors

Dependent functions

Planning

Further notes






BAL_S_LOG - Application Log: Log header data   TXBHW - Original Tax Base Amount in Local Currency  
This documentation is copyright by SAP AG.

Length: 2281 Date: 20240520 Time: 220238     sap01-206 ( 43 ms )