Ansicht
Dokumentation

Assign Calendar for Scheduling of Orders (New) ( RELNPM_602_LOG_EAM_CI1_1 )

Assign Calendar for Scheduling of Orders (New) ( RELNPM_602_LOG_EAM_CI1_1 )

BAL Application Log Documentation   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Assign Calendar for Scheduling of Orders (New)

Use

As of SAP ECC 6.0, Enhancement Package 2 (SAP_APPL 602), you can specify in a maintenance or service order which factory calendar you want the system to use as a basis for scheduling the order.

  • The default value is work center - this corresponds to the previous standard. The system bases scheduling on the factory calendar assigned to the work center of the operation or to the plant.
  • If you choose order header, scheduling is based on the factory calendar you specified in the order header.
  • If you enter network operation, the system bases scheduling on the factory calendar that is assigned to the network operation of the order.

Effects on Existing Data

Effects on Data Transfer

Effects on System Administration

Effects on Customizing

Further Information






BAL_S_LOG - Application Log: Log header data   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.

Length: 1280 Date: 20240604 Time: 030618     sap01-206 ( 22 ms )