Ansicht
Dokumentation
Assign Calendar for Scheduling of Orders (New) ( RELNPM_602_LOG_EAM_CI1_1 )
BAL Application Log Documentation rdisp/max_wprun_time - Maximum work process run timeThis documentation is copyright by SAP AG.
Short text
Assign Calendar for Scheduling of Orders (New)
Use
As of SAP ECC 6.0, Enhancement Package 2 (SAP_APPL 602), you can specify in a maintenance or service order which factory calendar you want the system to use as a basis for scheduling the order.
- The default value is work center - this corresponds to the previous standard. The system bases scheduling on the factory calendar assigned to the work center of the operation or to the plant.
- If you choose order header, scheduling is based on the factory calendar you specified in the order header.
- If you enter network operation, the system bases scheduling on the factory calendar that is assigned to the network operation of the order.
Effects on Existing Data
Effects on Data Transfer
Effects on System Administration
Effects on Customizing
Further Information
BAL_S_LOG - Application Log: Log header data rdisp/max_wprun_time - Maximum work process run time
This documentation is copyright by SAP AG.
Length: 1280 Date: 20240604 Time: 030618 sap01-206 ( 22 ms )