LOG_PP_LMAN: Integration of Kanban in the Heijunka Process

Use

As of SAP ECC 6.0, Enhancement Package 2 (SAP_APPL 602), Business Function Lean Manufact., MRP Evaluations, various changes have been made in the Kanban area to support the process of production smoothing.

Assignment of MRP Planned Orders to Kanbans

When the status of a kanban changes from "Full" to "Empty", normally a new planned order is generated or an existing one from MRP reduced.

As of SAP ECC 6.0, Enhancement Package 2 (SAP_APPL 602), you can specify that no new planned order is to be created when a kanban is set to "Empty", but that a planned order created in MRP is to be used for the empty kanban. If you have already created a sequence for the planned orders in Sequencing, the planning already carried out is retained.

You make the relevant settings in Customizing for Replenishment Strategies for In-House Production. The assignment of the planned orders is possible only for the control types Processing with Planned Orders/Preplanning in MRP or Processing with Planned Orders and Cost Collector. For these two control types, the indicators Prodn Plan Use and Reuse Horizon are shown. Make the necessary settings here.

In order that the planned order can be used for a kanban, the quantity of the planned order must be the same as the kanban quantity.

You make the settings for the use of planned orders in Kanban in Customizing under Production → Kanban → Replenishment Strategies → Replenishment Strategies with In-House Production.

Planned Order Data on the Kanban Board

You can display the order data for a material and the scheduled dates/times of the orders on the kanban board.

With the Business Add-In BADI_GUI_ALV_GRID_EXT in the enhancement spot ES_GUI_ALV_EXT, you can adjust the list of planned order data on the kanban board on a customer-specific basis. To do so, you must specify the filter value SAPLMPKP/SORD/ for the BAdI.

Kanban Data on the Sequence Planning Board

On the sequence planning board, you can display kanban information on a planned order that is assigned to a kanban. To do so, show the order list on the sequence planning board.

Effects on Existing Data

There are no fundamental effects on the dataset.

Effects on Data Transfer

Effects on System Administration

Effects on Customizing

Further Information

Heijunka Process






rdisp/max_wprun_time - Maximum work process run time   ROGBILLS - Synchronize billing plans  
This documentation is copyright by SAP AG.

Length: 3210 Date: 20240523 Time: 075409     sap01-206 ( 55 ms )