LOG_PP_LMAN: Kanban with Reporting Point Confirmation ( RELNPP_602_MAN_KANBAN7 )

LOG_PP_LMAN: Kanban with Reporting Point Confirmation ( RELNPP_602_MAN_KANBAN7 )

Vendor Master (General Section)   General Material Data  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

LOG_PP_LMAN: Kanban with Reporting Point Confirmation

Use

As of SAP ECC 6.0, Enhancement Package 2 (SAP_APPL 602), Business Function Lean Manufacturing, MRP Evaluations (LOG_PP_LMAN), a replenishment strategy is available in Kanban for repetitive manufacturing with reporting points. Here, separate control cycles are created for operations with milestone confirmation. The quantities manufactured in the control cycle are reported back (confirmed) as reporting point stock. If components are maintained at the reporting point, goods issues are posted for the components and the goods receipt for the finished product can be posted at the last reporting point.

You can use this procedure if a material passes through several processing stations represented by the control cycles, for example. In the process, materials with separate material numbers are not produced in the individual control cycles. Instead, one material that always has the same material number is processed. The operations are defined in the routing as milestones. In Kanban, control cycles are then created for each operation so that production can be controlled at each operation via kanbans.

For Kanban processing with reporting points, as of Release ERP 2007, the control types Processing with Cards and Reporting Points and Processing with Cards and Reporting Points/Preplanning with MRP are supplied in Customizing for replenishment strategies with in-house production.

Control Cycle Maintenance

If you create a control cycle whose replenishment strategy provides for reporting point confirmation, you get an additional field in control cycle maintenance in which you enter the reporting point.

The confirmation of the kanban then takes place for this reporting point. The confirmed materials are managed as reporting point stock

Integration in Kanban Board

You can branch from the kanban board to the reporting point stock of a control cycle. Furthermore, you can show reporting point information and work center information pertaining to a control cycle on the kanban board.

Effects on Existing Data

There are no fundamental effects on the dataset.

Effects on Data Transfer

Effects on System Administration

Effects on Customizing

To create a replenishment strategy with reporting points, in Customizing choose Production → KANBAN → Replenishment Strategies → Define In-House Production Strategies.

Further Information