LOG_PP_MIS: Enhancements in Order Report (New) ( RELNPP_603_MAN_AUFTRBER )

LOG_PP_MIS: Enhancements in Order Report (New) ( RELNPP_603_MAN_AUFTRBER )

CL_GUI_FRONTEND_SERVICES - Frontend Services   SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

LOG_PP_MIS: Enhancements in Order Report (New)

Use

As of SAP ECC 6.0, Enhancement Package 3 (SAP_APPL 603), Business Function Manufacturing Information System (LOG_PP_MIS), you can display the time delay to which the following MRP elements are subject on a multilevel basis in the order report:

  • Sales order
  • Project
  • WSB element
  • Production order
  • Process order
  • Network
  • Planned order

The order report can now calculate and display the delay (for sales orders, for example) on a multilevel basis, in ascending order from bottom to top starting with the lowest MRP level. In the process, both the delay of the individual receipt element and the total delay resulting from the delays of the lower MRP levels are displayed. The delay is calculated in working days.

The multilevel delay at the level of a sales order is calculated as follows:

Total delay of sales order = Delay of receipt element at highest MRP level + cumulated delay of subordinate MRP levels.

The multilevel delay can only be calculated for MRP-relevant sales orders. In the process, the delay is calculated per sales order item.

The following new columns are offered in the order report to show the delay:

  • Time unit of delay

The columns with the information on the single-level delay as previously calculated are no longer displayed in the order report because they have been superseded by the new columns with the values for the multilevel delay. The following columns no longer appear:

  • Icon for delay (traffic light)
  • Actual delay
  • Unit of actual delay
  • Expected delay
  • Unit of delay
  • Icon for quantity variance
  • Quantity variance
  • Unit of quantity variance

Effects on Existing Data

Effects on Data Transfer

Effects on System Administration

Effects on Customizing

The IMG activity Define Profiles for Order Report has been enhanced through the addition of settings for calculation and display of the multilevel delay in the order report:

  • New fields:

  • Indicator for activation of calculation of multilevel delay

  • Indicator for consideration of operations for calculation of delay (performance switch)

  • Threshold values for critical/noncritical delay

  • Fields to be removed:
Because the previous calculation of delay has been replaced by the multilevel delay, all the fields for the former are now no longer used. These fields have not been deleted but are hidden. You can unhide them if necessary through a modification and thus reactivate the previous method of calculating delay.

In the standard system, the following settings for multilevel delay are supplied in the standard profiles SAP000000001 and SAP000000002:

  • The indicator for activation of the calculation of multilevel delay is set
  • The optimistic calculation is selected.
  • Threshold values
Noncritical: 0 days, Critical: 1 day, Highly critical: 1 day
As a result of this setting, all MRP elements without delay get a green icon @5B@. As soon as a delay occurs, this changes to red @5C@.

Further Information

For more information refer to the documentation for material requirements planning under Material Requirements Planning (PP-MRP) --> Planning Evaluation (PP-MRP-PE) --> Order Report --> Calculation and Display of Multilevel Delay in the SAP Library.