Ansicht
Dokumentation

Determining Quantities for Batches/Discontinued Materials (Backflushing) ( RELNPP_FA_45A_ZBATCHQTY )

Determining Quantities for Batches/Discontinued Materials (Backflushing) ( RELNPP_FA_45A_ZBATCHQTY )

General Material Data   Addresses (Business Address Services)  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Determining Quantities for Batches/Discontinued Materials (Backflushing)

Description

How the system determines quantities in the case of batch splits or discontinued materials in backflushing has been changed. The requirements or stocks resp. are now reduced sequentially.

This means in detail:

  • Batch split
The batch stocks for a material are reduced according their order in the component overview of the order. The consumed quantity of a component is withdrawn during several partial confirmations from the first batch until the planned requirements quantity is reached ot hr batch is used up. Withdrawals are then made from the next batch.
The order of the batchs in the component overview is determined by the sort in the batch search strategy.
  • Discontinued materials
In the case of simple discontinuation, the stock of the material to be be discontinued is used first, then the stock of the new material.
In the case of parallel discontinuation, the stock of the main discontinued part is used first, then the stock of the new material(s).
The discontinued/new materials should be treated in the same way for backflushing. For example the old and the new materials should both be backflushed or both not be backflushed.

For further information, refer to R/§ LIbrary for PP - Production orders (PP-SFC) in the section Determining Quantities for Batch Split/ Part to be Discontinued.






rdisp/max_wprun_time - Maximum work process run time   General Data in Customer Master  
This documentation is copyright by SAP AG.

Length: 1778 Date: 20240603 Time: 220834     sap01-206 ( 35 ms )