Ansicht
Dokumentation
PP-PDC Interface ( RELNPP_FA_46A_060CONF3 )
Fill RESBD Structure from EBP Component Structure rdisp/max_wprun_time - Maximum work process run timeThis documentation is copyright by SAP AG.
Short text
PP-PDC Interface
Scope of Functions
The PP-PDC interface is available as of release 4.6A. It is an interface for R/3 Shop Floor Control and is standardized for connecting subsystems that are used to enter time tickets and time events.
The interface used previously (as of Release 3.0A) was called Communication Channel 2 (CC2). In comparison to the previous interface, the new interface includes an enhanced range of business functions. In addition, it has been implemented as an asynchronous SAP R/3 BAPI interface that functions without the transceiver.
Subsystems can take part in the SAP Complementary Software Program (CSP) for this interface.
The PP-PDC interface functions as follows:
- To download the master data, schedule program SAPPPC22 in a background job. It sends the data to the subsystem.
- To download the order operations, schedule program CIBDOP_DOWN_PP in a background job. It sends the data to the subsystem.
- To upload, schedule the program CIBDCONF_REQUEST in a background job. It requests the data from the subsystem.
The PP-PDC interface contains the following methods:
- Download work centers
- BOR object: RCVPRORDCF Method: ReceiveWorkCenter
- Download order operations
- BOR-Object: RCVPRORDCF Method: ReceiveProdOrder
- Upload request
- BOR object: RCVPRORDCF Method: RequestProdOrdConf
- Upload time tickets
- BOR object: BUS2116 Method: CreatePredefTimeTicketMultiple
- Upload time events
- BOR object: BUS2116 Method: CreatePredefTimeEventMultiple
TXBHW - Original Tax Base Amount in Local Currency General Material Data
This documentation is copyright by SAP AG.