Changes to Production and Process Orders ( RELNPP_FA_470_CHNG )

Changes to Production and Process Orders ( RELNPP_FA_470_CHNG )

CPI1466 during Backup   ABAP Short Reference  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Changes to Production and Process Orders

Use

As of SAP R/3 Enterprise Core 4.70 (SAP_APPL 470), the production orders and process orders function has been enhanced as following:

  • Joint venture connection for process order (only for process orders).
    In the process order, on the detail screen Assignments, a Joint Venture button is displayed if the joint venture accounting is active. If the process order is assigned to a WBS element, the relevant joint venture data is derived from this. Choose the Joint Venture button to display or change the joint venture data.
  • Document link from production version (only for production orders).
    Previously, the documents that were copied into the production order were linked with the material master of the assembly to be produced or included in the BOM related to the order. Now, documents can also be assigned to the production version. These documents are then copied into the production order.
  • Capacity requirement reduction by confirmations (only for production orders).
    In the work center there is a new indicator Control Capacity Reduction for each capacity segment (set up, process, tear down). The indicator controls the capacity reduction of the segment with confirmations. It has the following features:
  • In proportion to quantity
    The quantity-proportional capacity reduction corresponds with the solution implemented in the releases up to SAP R/3 4.6. The capacity requirement is therefore considerably reduced if the relevant operation is finally confirmed, or with quantity-dependent forms, (at least) the complete quantity of the operations was partially confirmed.

  • Complete in partial confirmation
    With a complete reduction in partial confirmation, the status of the relevant operation is analyzed. If this is partially or finally confirmed, the relevant capacity requirement is completely reduced. A partial reduction is not possible.

  • Complete in final confirmation
    With a complete reduction in final confirmation, the status of the relevant operation is analyzed. If this is finally confirmed, the relevant capacity requirement is completely reduced. A partial reduction is not possible.

  • In proportion to activity
    If the capacity reduction takes place in proportion to the activity, the activity that is assigned in your record type group (see tab page Cost Center Assignment from work center) to the relevant capacity segment is determined. The planned capacity is then reduced by the confirmed activity quantity.

  • Transfer of WM warehouse numbers from updated supply area (production and process orders).
    When a new supply area is created on the goods movement overview of the pick list or the confirmation, checks are carried out to determine whether this supply area exists and is maintained for the storage location. When you save the goods movement, the system determines the WM warehouse numbers using the current supply area.

Effects on Existing Data

Effects on Data Transfer

Effects on System Administration

Effects on Customizing

Further Information