Ansicht
Dokumentation

Enhancements to Reorder Point MRP with External Requirements ( RELNPP_MRP_40A_BESTPDISP )

Enhancements to Reorder Point MRP with External Requirements ( RELNPP_MRP_40A_BESTPDISP )

PERFORM Short Reference   CPI1466 during Backup  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Enhancements to Reorder Point MRP with External Requirements

Description

The system includes sales orders and manual reservations in the requirements calculation in reorder point planning with external requirements (MRP type V1 and V2). In addition, you can set whether these requirements are relevant for MRP to the total planning horizon or only to the replenishment lead time of the material.

In release 4.0, it is possible to define which requirements the system is to include in the planning run, in addition to the customer requirements and manual reservations. To do this, select the appropriate fields in Customizing for MRP. The following requirements can be included:

  • Stock transfer requirements based on stock transport requisitions, stock transport orders and stock transport schedule orders
  • Dependent reservations based on production orders, maintenance orders and collective orders
  • Requirements for material provided in subcontracting

Damage caused to data by errors

Software/hardware requirements

Installation information

Effects on System Administration

Effects on Customizing

You can set additional requirements for MRP types V1 (manual reorder point planning with external requirements) and V2 (automatic reorder point planning with external requirements) in Customizing for MRP under Check MRP types.

Effect on batch input

Changes to the Interface

Changes in procedure

Procedure for removing dataset errors

Dependent functions

Planning

Further notes






RFUMSV00 - Advance Return for Tax on Sales/Purchases   General Material Data  
This documentation is copyright by SAP AG.

Length: 2050 Date: 20240523 Time: 075552     sap01-206 ( 38 ms )