Ansicht
Dokumentation
Single-Item, Multi-Level Planning in Simulative Mode ( RELNPP_MRP_40A_EINZPLIHS )
SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up BAL_S_LOG - Application Log: Log header dataThis documentation is copyright by SAP AG.
Short text
Single-Item, Multi-Level Planning in Simulative Mode
Description
In single-item, multi-level planning, it is possible to carry out the planning run in the main memory where it is also possible to check and change the results. Search and evaluation functions are available to help recognize and solve problem situations.
The system displays problems in lower-level assemblies or components at finished product level and these problems can be solved immediately. To improve the performance of the database, the changes are not saved until the MRP controller is satisfied with the planning results of all the materials in the BOM structure.
Simulative planning is a tool that can be used to plan larger BOM structures so that you can recognize and solve problem situations on time.
The following functions are available:
- All the materials in a multi-level BOM structure are planned top-down.
- All changes are saved in the main memory. The results are not entered into the database until after changes are saved.
- The system sets an exception message in the planned order of the higher-level material and the system displays the delay for problems such as order dates in the past. The system displays the total number of days that a planned order is delayed due to a problem with a lower-level assembly or component.
- Evaluation functions such as the order report and the pegging function enable you to quickly find the procurement element causing the delay or the exception message.
- You can change the procurement elements and repeat the planning run for the next lower level of the BOM to solve problems.
Damage caused to data by errors
Software/hardware requirements
Installation information
Effects on System Administration
Effects on Customizing
Effect on batch input
Changes to the Interface
The simulative mode field has been added to the initial screen of single-item, multi-level planning. You can start planning in simulative mode by selecting this field.
Changes in procedure
Procedure for removing dataset errors
Dependent functions
Planning
Further notes
PERFORM Short Reference ROGBILLS - Synchronize billing plans