Use
As of SAP R/3 Enterprise 4.70 (SAP_APPL 470) Business Add-Ins (BAdIs) are available for the following functions in material requirements planning (MRP):
MRP General
- Changing subcontracting logic: MD_SUBCONT_LOGIC
Using this BAdI, you can deactivate the separate consideration of provision stocks and requirements in MRP and the stock/requirements list.
- Changing logic for importing MRP data: MD_CHANGE_MRP_DATA
Using this BAdI, you can exclude from, add to, or change the characteristics for certain elements for MRP when the MRP elements are read from the database.
- Changing the requirements dates of stock transfers: MD_STOCK_TRANSFER
Using this BAdI, you can change the requirements dates for requirements for procurement proposals in the issuing plant.
MRP Planning Valuation (PP-MRP-BD)
- Processing the MRP list further: MD_MRP_LIST
Using this BAdI, you can process the MRP list data further during posting in the planning run.
- Changing the display of MRP elements: MD_DISPLAY_ELEMENT
Using this BAdI, you can change how the system displays MRP elements in the valuation list and the planning run.
- Planning and preparing planning data: MD_PLANNING_RESULT
Using this BAdI, you can process the statistical data in the planning run further. You can, for example, trigger a separate workflow, so that you are informed of dumps or cancellation MRP list via mail.
MRP Procurement Proposal (PP-MRP-PP)
- Changing the procurement proposal: MD_PURREQ_CHANGE
Using this BAdI, you can change the data in purchase requisition before posting in the planning run or before posting during planned order conversion.
- Processing purchase requisitions further: MD_PURREQ_POST
Using this BAdI, you can further process data from planned orders that are posted in the planning run or during planned order conversion.
- Changing planned orders: MD_PLDORD_CHANGE
Using this BAdI, you can change the data from planned orders before posting in the planning run, or before posting during manual planned order changes.
- Processing planned orders further: MD_PLDORD_POST
Using this BAdI, you can further process the data from planned orders, which are posted in the planning run or posted during manual planned order processing. You can, for example, log any changes made.
- Changing source assignment: MD_MODIFY_SOURCE
Using this BAdI, you can change the assignment of sources in the planning run according to your own criteria.
- Determining production order: MD_MODIFY_PRODVERS
Using this BAdI, you can determine production versions according to your own criteria, both during the planning run and during manual creation of production versions.
- Logging planned order postings due to time stamp problems: MD_PLDORD_TIME_STAMP
Using this BAdI, you can log planned order postings that were rejected by the system due to time stamp problems.
- Scheduling planned orders: MD_PLDORD_SCHEDULING
Using this BAdI, you can change the scheduling parameters for planned orders.
MRP Planning Execution (PP-MRP-PR)
- Changing the package size in a planning run parallel to MRP: MD_MRP_RUN_PARALLEL
Using this BAdI, you can individually determine the size of material packages used for the parallel planning run.
Long-term planning/Simulation (PP-MP-LTP)
- Defining additional parameters in the planning scenario: MD_PLANNING_SCENARIO
Using this BAdI, you can display additional data in the planning scenario and maintain your own planning scenario parameters.
Effects on Existing Data
Effects on Data Transfer
Effects on System Administration
Effects on Customizing
To activate a Business Add-In, you have to create an active implementation. To do this, choose Tools -> ABAP Workbench -> Utilities-> Business Add-Ins -> Implementation in the SAP menu.
You can find further information in the SAP Library under Basis -> ABAP-Workbench -> Changing the SAP standard -> Business Add-Ins -> Implementing a Business Add-Ins.
Further Information
rdisp/max_wprun_time - Maximum work process run time CPI1466 during Backup
This documentation is copyright by SAP AG.
Length: 6111 Date: 20240603 Time: 214453 sap01-206 ( 66 ms )