Ansicht
Dokumentation

Business Add-Ins in MRP ( RELNPP_MRP_470_BADIS )

Business Add-Ins in MRP ( RELNPP_MRP_470_BADIS )

Fill RESBD Structure from EBP Component Structure   Addresses (Business Address Services)  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Business Add-Ins in MRP

Use

As of SAP R/3 Enterprise 4.70 (SAP_APPL 470) Business Add-Ins (BAdIs) are available for the following functions in material requirements planning (MRP):

MRP General

  • Changing subcontracting logic: MD_SUBCONT_LOGIC
    Using this BAdI, you can deactivate the separate consideration of provision stocks and requirements in MRP and the stock/requirements list.
  • Changing logic for importing MRP data: MD_CHANGE_MRP_DATA
    Using this BAdI, you can exclude from, add to, or change the characteristics for certain elements for MRP when the MRP elements are read from the database.

MRP Planning Valuation (PP-MRP-BD)

  • Planning and preparing planning data: MD_PLANNING_RESULT
    Using this BAdI, you can process the statistical data in the planning run further. You can, for example, trigger a separate workflow, so that you are informed of dumps or cancellation MRP list via mail.

MRP Procurement Proposal (PP-MRP-PP)

  • Changing the procurement proposal: MD_PURREQ_CHANGE
    Using this BAdI, you can change the data in purchase requisition before posting in the planning run or before posting during planned order conversion.
  • Changing planned orders: MD_PLDORD_CHANGE
    Using this BAdI, you can change the data from planned orders before posting in the planning run, or before posting during manual planned order changes.
  • Processing planned orders further: MD_PLDORD_POST
    Using this BAdI, you can further process the data from planned orders, which are posted in the planning run or posted during manual planned order processing. You can, for example, log any changes made.
  • Changing source assignment: MD_MODIFY_SOURCE
    Using this BAdI, you can change the assignment of sources in the planning run according to your own criteria.
  • Determining production order: MD_MODIFY_PRODVERS
    Using this BAdI, you can determine production versions according to your own criteria, both during the planning run and during manual creation of production versions.
  • Scheduling planned orders: MD_PLDORD_SCHEDULING
    Using this BAdI, you can change the scheduling parameters for planned orders.

MRP Planning Execution (PP-MRP-PR)

Long-term planning/Simulation (PP-MP-LTP)

Effects on Existing Data

Effects on Data Transfer

Effects on System Administration

Effects on Customizing

To activate a Business Add-In, you have to create an active implementation. To do this, choose Tools -> ABAP Workbench -> Utilities-> Business Add-Ins -> Implementation in the SAP menu.

You can find further information in the SAP Library under Basis -> ABAP-Workbench -> Changing the SAP standard -> Business Add-Ins -> Implementing a Business Add-Ins.

Further Information






rdisp/max_wprun_time - Maximum work process run time   CPI1466 during Backup  
This documentation is copyright by SAP AG.

Length: 6111 Date: 20240603 Time: 214453     sap01-206 ( 66 ms )