Ansicht
Dokumentation

Safety Time Less than one Day (Enhanced) ( RELNPP_MRP_500_SAFETIME )

Safety Time Less than one Day (Enhanced) ( RELNPP_MRP_500_SAFETIME )

Vendor Master (General Section)   ABAP Short Reference  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Safety Time Less than one Day (Enhanced)

Use

From SAP ECC 5.00 SCM Extension (EA-SCM 500), you can use the period profile for safety time/actual range of coverage to define a safety time that is less than one day to achieve a more detailed setting of the actual range of coverage. Until now, you could only define a specific number of days for the safety time.

The IMG activity Define Period Profile for Safety Time/Actual Range of Coverage has been extended by the Safety Time % field.

Example

To define a sub-day safety time of 2.2, for example, proceed as follows:

  1. You create a Safety Time Period Profile and enter the period in which the safety time of 2.2 days is to apply.
  2. Enter 2 (Days) in the Safety Time field.
  3. Enter 20 (Percent) in the Safety Time % field.
  4. You set the safety time indicator and enter the safety time period profile in the material master record.

In the planning run, the system splits the daily requirement: 80% of the requirement quantity is brought forward 2 days on the time axis, 20% is brought forward 3 days on the time axis. The system brings the quantities forward in simulative mode only. The actual requirements date does not change. The receipt elements are created on a suitable date. You can display the safety time in the stock/requirements list using the function key @1U@ Switch on ST. Note that, when using the sub-day safety time, the requirement quantity of an individual requirement is always displayed according to the percentage value defined - even if you have not switched on the safety time in the display.

A requirement for 100 pieces with the requirements date 09.09.2004 and a safety time of 2.2 days results in the following split:

Date Quantity
09.06.04. 20 pieces
09.07.04. 80 pieces

Effects on Existing Data

Effects on Data Transfer

Effects on System Administration

Effects on Customizing

Further Information

For more information, refer to the SAP Library in the component Material Requirements Planning (PP MRP) under Planning Process --> Ranges of Coverage in MRP --> --> Statistical Range of Coverage Calculation with Range of Coverage Profiles --> Safety Time / Actual Range of Coverage.






Addresses (Business Address Services)   TXBHW - Original Tax Base Amount in Local Currency  
This documentation is copyright by SAP AG.

Length: 3352 Date: 20240604 Time: 032159     sap01-206 ( 70 ms )