Master Production Schedule : Planning Situation with DRP Evaluation

Description

In release 3.0, the planning situation can also be accessed in the form of a DRP evaluation. In the DRP evaluation, the system checks per plant which receipts and requirements have been scheduled in this plant and which receipts and requirements go from this plant to other plants. Here, receipts and requirements from/into other plants are recorded as external or internal receipts and issues.

Steps to take

To access the DRP evaluation, select Planning situation -> IndLayout material.
The system branches into the initital screen of the evaluation.
Select the field, DRP evaluation and press ENTER.
The system branches into the DRP evaluation.
First, the system only displays the receipts and the issues that have been scheduled for the plant that you used to access the evaluation.
To display the receipts and issues to or from other plants, select the hierarchy element and press the key, 'Details: plants'
The system displays the internal or external receipts and issues:

  • External means issues to the customers or receipts from vendors
  • For stock transfers from/to in-house plants, the system displays the transfer quantity from each plant individually.
  • For in-house production (that is, the plant with which the evaluation was accessed), the production quantities are displayed as receipts with this plant key.

Note

Demand management can be carried out for external requirements, that is, customer requirements, and for internal requirements (strategy, planning at assembly level). Depending on the strategy, a planned independent requirement is valid as an external requirement or as a requirement in the in-house plant.
Unplanned requirements are always considered as requirements from the in-house plant.

Damage caused to data by errors

Software/hardware requirements

Installation information

Effects on System Administration

Effects on Customizing

Effect on batch input

Changes to the Interface

Changes in procedure

Procedure for removing dataset errors

Dependent functions

Planning

Further notes






RFUMSV00 - Advance Return for Tax on Sales/Purchases   BAL_S_LOG - Application Log: Log header data  
This documentation is copyright by SAP AG.

Length: 2818 Date: 20240523 Time: 055334     sap01-206 ( 48 ms )