Ansicht
Dokumentation

Material Requirements Planning: Multi-Level, Single-Item Planning for Product Groups ( RELNPP_MRP_PRODUKTEINZEL )

Material Requirements Planning: Multi-Level, Single-Item Planning for Product Groups ( RELNPP_MRP_PRODUKTEINZEL )

SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up   RFUMSV00 - Advance Return for Tax on Sales/Purchases  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Material Requirements Planning: Multi-Level, Single-Item Planning for Product Groups

Description

From release 3.0 it is now possible to carry out single-item, multi-level planning for product groups whose members are materials. The product group is exploded during the planning run and all members of the product group are planned as well as all the assemblies and components required for production and procurement. Product group planning is possible both in material requirements planning and in master production scheduling.

Steps to take

In the main menu of material requirments planning or of master production scheduling, select the single-item, multi-level planning.

Enter the number of the product group in the field, Material. You must also select the field, Product group in the section of the screen entitled, "Scope of planning".

Damage caused to data by errors

Software/hardware requirements

Installation information

Effects on System Administration

Effects on Customizing

Effect on batch input

Changes to the Interface

Changes in procedure

Procedure for removing dataset errors

Dependent functions

Planning

Further notes






Vendor Master (General Section)   Vendor Master (General Section)  
This documentation is copyright by SAP AG.

Length: 1665 Date: 20240523 Time: 055943     sap01-206 ( 33 ms )